You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
THE DEVELOPMENT OF A MULTIPLE INPUT SPECTROMETER FOR PROCESSMONITORING APPLICATIONS
SBC: Chromex Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
FIBER OPTIC LONG COUNTER
SBC: FIBERTEK, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
HIGH-POWER TRANSVERSE-MODULATION MICROWAVE GENERATOR WITH AXIAL-FIELD CONFINEMENT
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
REDUCING UTILITY DEMAND LEVELS BY AUTOMATIC DEMAND PEAK SHAVING WITH USER STANDBY GENERATORS.
SBC: Hallmark Energy Economics Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS
SBC: MISSION RESEARCH CORP. Topic: N/AHIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...
SBIR Phase I 1990 Department of Energy -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
A NEW ELECTROSTATIC ACCELERATOR FOR POSITRON EMISSION TOMOGRAPHY
SBC: North Star Research Corp. Topic: N/ATHE OBJECTIVE OF OUR PROJECT IS TO DEVELOP NEW MEANS OF PRODUCING SHORT LIVED RADIOISOTOPES FOR POSITRON EMISSION TOMOGRAPHY (PET). THIS MEDICAL DIAGNOSTIC TECHNIQUE IS CAPABLE OF DISCERNING AND IMAGING MEDICALLY INTERESTING PHENOMENA, SUCH AS THE ACTIVITY OF VARIOUS PARTS OF THE BRAIN, OXYGEN FLOW IN THE BODY, AND OTHER QUANTITIES WHICH ARE IMPOSSIBLE TO DETERMINE BY ANY OTHER DIAGNOSTIC TECHNIQU ...
SBIR Phase I 1990 Department of Energy -
IMPROVED ENHANCED OIL RECOVERY PROCESSES USING NEW AND NOVEL SYNTHETIC COPOLYMERS CONTAINING LARGE AMOUNTS OF ACRYLAMIDE
SBC: R. L. Clampitt And Topic: N/AINDEPENDENTS IN THE MID-CONTINENT AREA INCLUDING OKLAHOMA AND KANSAS, NEED A NEW AND NOVEL WATER SOLUBLE POLYMER FOR INDEPTH MOBILITY CONTROL IN ENHANCED OIL RECOVERY (EOR) PROCESSES AT INTERMEDIATE TEMPERATURES OF 165 TO 200 FAHRENHEIT. PARTIALLY HYDROLYZED POLYACRYLAMIDES AND NATURAL POLYMERS HAVE HISTORICALLY BEEN THE PRODUCTS USED IN THIS REGION. AND IN ESSENTIALLY ALL OF THE EARLIER EOR PROJE ...
SBIR Phase I 1990 Department of Energy -
MULTIPLE SCALE VALLEY-FILL RESERVOIR HETEROGENEITIES AND GEOLOGIC AND ENGINEERING RESERVOIR CHARACTERIZATION
SBC: R W Tillman Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
A NOVEL LEAK DETECTOR FOR XENON
SBC: SOUTHWEST SCIENCES INC Topic: N/AWE DESCRIBE A NOVEL LEAK DETECTOR FOR XENON THAT HAS DIRECT APPLICATION TO TESTING RADIO-ISOTOPE-POWERED THERMOELECTRIC GENERATORS. SUCCESSFUL DEMONSTRATION OF OUR INNOVATION WILL ALLOW IMPROVED EFFICIENCY IN THERMOELECTRIC GENERATORS BY REMOVING THE HELIUM THAT IS NOW ADDED TO THE XENON BUFFERGAS FOR LEAK CHECKING PURPOSES. THE PHASE I RESEARCH PROGRAM WILL PROVIDE THE CRITICAL DESIGN INFORMATION ...
SBIR Phase I 1990 Department of Energy