You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Data Mining Techniques for Plan Sentinel Development

    SBC: DEUMBRA, INC.            Topic: N/A

    We propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  2. Automated Target Assessment Development Environment

    SBC: ABTECH CORPORATION            Topic: N/A

    Automated processing of sensor/signal data and other non-sensor information provides substantial force-multiplying benefits. The timely and cost-effective leveraging of these types of information provides a significant advantage over adversaries not possessing comparable information processing capabilities. The intelligent processing of diverse types of data provides a target assessment technology ...

    SBIR Phase II 1996 Department of DefenseDefense Advanced Research Projects Agency
  3. Automated Target Assessment Development Environment

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  4. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  5. PULSE DETONATION SYNTHESIS FOR HIGH TEMPERATURE CERAMIC COMPOSITES AND COATINGS

    SBC: Adroit Systems, Inc.            Topic: N/A

    Adroit Systems, Inc. will develop a Pulse Detonation Synthesis (PDS) process to manufacture ceramic powders from gas-powder reactant mixtures more efficiently and inexpensively than current methods. A high combustion rate and simple design make the PDS system capable of mass producing these powders, which are used as raw materials for high-temperature, high-performance ceramics and ceramic composi ...

    SBIR Phase I 1994 Department of DefenseMissile Defense Agency
  6. Video Retrieval Based on Language and Image Analysis

    SBC: Advance, Inc.            Topic: N/A

    We propose to develop practical video libraries allowing users to quickly find useful material. Commercial, home, or surveillance video programming captures information in multiple tracks: picture, sound, and closed captioning. Using multiple modalities cataloging information, visual information, and audio information is critical since no one track contains necessary information to identify clip ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  7. Video Retrieval Based on Language and Image Analysis

    SBC: Advance, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  8. Nanoelectric Modeling Software Development

    SBC: Advanced Device Technologies,            Topic: N/A

    This Phase I project has two primary objectives. The first objective is to develop an engineering model of Resonant Tunneling Devices (RTD) to be implemented in AIM-Spice, a commercial software package running under Windows 95/NT. The development of a reliable device model is a prerequisite for the design and production of any semiconductor device technology. The RTD model will be a semi-empiri ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  9. Ion-Implanted 2-D MESFET Technology for Wireless Communications

    SBC: Advanced Device Technologies,            Topic: N/A

    This Phase I project has two primary objectives. The first objective is to evaluate the feasibility of a fully ion implanted fabrication process based on the heterodimensional 2-D MESFET. The new device, the 2-D JFET, will have p+ ion implanted sidegates which laterally modulate a thin, highly doped n-type conducting channel. The 2-D JFET should have excellent high speed, low power characteristics ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  10. Develop Exercise Software to Run on ARPA JANUS-3D Warqame in UNIX Environment

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government