You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. DEVELOPMENT OF AN UNDER-ICE REMOTELY OPERATED/AUTONOMOUS VEHICLE

    SBC: BENTHOS, INC.            Topic: N/A

    BENTHOS, A WORLD LEADER IN THE DEVELOPMENT OF ROVS, WITH THEMIT SEA GRANT RESEARCH LABORATORY, A GROUP FOCUSED ON AUTONOMOUS VEHICLE CONTROL SYSTEMS, HAVE CONCEIVED A COMPACTVEHICLE SYSTEM CAPABLE OF SUPPORTING RESEARCH IN AREAS INACCESSIBLE TO MANNED SUBMERSIBLES, SUCH AS UNDER ICE. THESELF-POWERED VEHICLE WILL BE CAPABLE OF TRANSMITTING REAL TIME VIDEO AND SENSOR DATA VIA A FIBER OPTIC UMBILICAL ...

    SBIR Phase I 1990 Department of Commerce
  3. MOORED INSTRUMENT HIGH SPEED ACOUSTIC TELEMETRY SYSTEM

    SBC: Datasonics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Commerce
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. REMOTE SENSING OF ESTUARINE AND NEAR-COAST SALINITY

    SBC: PROSENSING INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Commerce
  6. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. NEURAL NETWORK APPLICATIONS FOR CLOUD-TRACK WIND DETERMINATION

    SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC.            Topic: N/A

    WE PROPOSE TO APPLY ARTIFICIAL NEURAL NETWORKS TO THE DERIVATION OF CLOUD MOTION VECTORS FROM SATELLITE IMAGERY. IN PHASE I, WE WILL CONCENTRATE ON USING A NEURAL NETWORK IN THE FIRST STEP IN THE DERIVATIO OF CLOUD MOTION VECTORS, THE HEIGHT ASSIGNMENT AND TARGET SELECTION. THE NEURAL NETWORK COMBINES, AT EACH IMAGE PIXEL, BRIGHTNESS IN DIFFERENT CHANNELS TO DETERMINE CLOUD TYPE AND LEVEL (I.E., L ...

    SBIR Phase I 1994 Department of Commerce
  8. ADVANCED SYSTEM FOR MINEHUNTING AND OCEANOGRAPHIC REMOTE SENSING

    SBC: Atlantic Applied Research Corp            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  9. PARALLEL METHODS FOR THE SCHROEDINGER EQUATION

    SBC: Aware, Inc.            Topic: N/A

    WE WILL DEVELOP WAVELET-BASED DOMAIN DECOMPOSITION PROCEDURES FOR THE SOLUTION OF THE INITIAL VALUE PROBLEM FOR THE SCHROEDINGER EQUATION ON MULTIDIMENSIONAL SPATIAL DOMAINS. ACCURATE AND PRACTICAL NUMERICAL CALCULATIONS WOULD BE OF GREAT USE IN THE IMPLEMENTATION AND EXTENSION OF THE BORN-OPPENHEIMER PROCEDURE. BEING BOTH COMPACTLY SUPPORTED AND ORTHOGONAL, WAVELETS COMBINE THE ADVANTAGES OF FINI ...

    SBIR Phase I 1994 Department of Commerce
  10. ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
US Flag An Official Website of the United States Government