You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ICING PREVENTION BY NUCLEATION OF ICE PARTICLES IN FRONT OF SUBSONIC AIRCRAFT

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    WE PROPOSE THE INVESTIGATION OF NUCLEATION PROCESSES CAPABLEOF CAUSING THE FREEZING OF SUPERCOOLED WATER DROPLETS IN FRONT OF A MOVING SUBSONIC AIRCRAFT. THE GOAL IS TO DEVELOPA NUCLEATION MECHANISM CAPABLE OF FREEZING THE WATER DROPLETS FAR ENOUGH IN FRONT OF THE MOVING PLANE SO THAT BY THE TIME THE PLANE REACHES THE DROPLETS THEY ARE FROZEN AND BOUNCE FROM THE LEADING EDGES AND THE IMPENAGE, WIT ...

    SBIR Phase I 1990 Department of Transportation
  2. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"

    SBC: Intellicorp            Topic: N/A

    COORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...

    SBIR Phase I 1990 Department of Transportation
  4. LOW COST HIGHLY INTEGRATED POSITION-ENHANCEMENT SYSTEM (LOCHIP)

    SBC: LINCOM CORP.            Topic: N/A

    THE OVERALL OBJECTIVE OF THIS PROJECT, INCLUDING PHASES I AND II, IS TO DEVELOP A DGPS RECEIVER FOR THE RECEPTION OF CODED MSK MODULATION USING VLSI TECHNOLOGY TO IMPLEMENT SIGNAL DEMODULATION AND DECODING. DURING PHASE I, THE FOLLOWING ISSUES WILL BE ADDRESSED: 1) SELECTION OF APPROPRIATE ATOMSPHERIC NOISE MITIGATION TECHNIQUES 2) SELECTION OF APPROPRIATE ALTERNATE DEMODULATION/ DECODING TECHNIQU ...

    SBIR Phase I 1990 Department of Transportation
  5. AUTOMATED TEST VEHICLE SYSTEM

    SBC: Macleod Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. LASER RADAR MEASUREMENT SYSTEM FOR ROADSIDE ENCROACHMENT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  8. SPIN-SYNCHRONOUS X-RAY SINOGRAPHY SYSTEM (SXS) FOR IN SITU TURBINE ENGINE FLAW DETECTION

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  9. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/Spec Inc.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  10. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government