You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ABDUCTIVE/EXPERT SYSTEM CONTROLLER

    SBC: ABTECH CORPORATION            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO DEMONSTRATE A PROTOTYPE CONTROLLER FOR A HOWITZER USING A HYBRID NETWORK AND PRODUCTION RULE SYSTEM. THE RESULTING ADAPTIVE CONTROLLER WILL DEMONSTRATE THE FEASIBILITY OF DEVELOPING A REVOLUTIONARY CONTROLLER CAPABLE OF ADAPTING IN A DYNAMIC ENVIRONMENT, MONITORING AND DIAGNOSING BEHAVIOR, AND PREDICTING FUTURE FAULTS AND MAINTENANCE REQUIREMENTS. ABTECH HAS DEVE ...

    SBIR Phase II 1994 Department of DefenseArmy
  2. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. ACOUSTIC ARRAY TECHNIQUE FOR WIND TUNNEL APPLICATIONS

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS IS A PROPOSAL TO PRODUCE AN ACOUSTIC ARRAY DESIGN SUITABLE FOR MAKING ACOUSTIC MEASUREMENTS OF MODEL HELICOPTERS IN A WIND TUNNEL. THIS "FEASIBILITY DESIGN" WILL DEMONSTRATE THE THEORETICAL FEASIBILITY OF SUCH A WIND TUNNEL ARRAY, AND WILL QUANTIFY THE PERFORMANCE OF SUCH AN ARRAY. THE WORK WILL INVESTIGATE THE DESIGN TRADEOFFS AVAILABLE AND WILL ESTABLISH THE COMPUTATIONAL REQUIREMENTS FOR A ...

    SBIR Phase II 1994 Department of DefenseArmy
  4. Acoustic Sensor Simulation and Environment Technology

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. Advanced Armor Vehicle Design

    SBC: Physics Mathematics &            Topic: N/A

    This project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. ADVANCED CONCEPT EVALUATION

    SBC: Physics Mathematics &            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  7. ADVANCED INTEGRATED SERVICES DATA DISTRIBUTION FOR TACTICAL C3I

    SBC: Lica Systems, Inc.            Topic: N/A

    THE ARMY'S CURRENT TACTICAL COMMUNICATIONS ARCHITECTURE CONSISTS OF THREE VERY CAPABLE BUT INDEPENDENT SYSTEMS: THE ARMY DIGITAL DATA SYSTEM (ADDS), THE MOBILE SUBSCRIBER EQUIPMENT (MSE), AND THE COMBAT NET RADIO FUNCTIONAL SYSTEM (CNR). FULLY AUTOMATED INTERFACES BETWEEN THESE SYSTEMS DO NOT EXIST. IN ADDITION, EACH SYSTEM HAS BEEN TAILORED FOR ONLY ONE TYPE OF COMMUNICATION SERVICE AND IN THE CA ...

    SBIR Phase II 1990 Department of DefenseArmy
  8. An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle

    SBC: NEW GENERATION MOTORS CORP.            Topic: N/A

    Military scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...

    SBIR Phase I 1997 Department of DefenseArmy
  9. ANALYSIS AND EVALUATION OF ADVANCED DIRECTION FINDING (DF) APPROACHES

    SBC: INFORMATION SYSTEMS LABORATORIES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  10. AN ASSESSMENT OF THE BEST ESTIMATE TRAJECTORY (BET) GENERATION METHODOLOGY UTILIZED AT THE KWAJALEIN MISSILE RANGE

    SBC: Flight Mechanics & Control Inc            Topic: N/A

    THE PHASE I SBIR PROPOSAL INCLUDED HEREIN ADDRESSES THE TOPIC NUMBER A90-443, ENTITLED TRAJECTORY ESTIMATION OF PROGRAM SOLICITATION 90.2. THE MAIN OBJECTIVE OF THIS PROPOSED EFFORT IS TO PROVIDE A MORE REALISTIC ASSESSMENT OF THE AERODYNAMIC FORCES ACTING ON AN ATMOSPHERIC REENTRY VEHICLE FLOWN FROM THE U.S. WEST COAST TO THE KWAJALEIN MISSILE RANGE (KMR). THE EFFECTS OF THESE FORCES ARE TO BE IN ...

    SBIR Phase II 1994 Department of DefenseArmy
US Flag An Official Website of the United States Government