You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  2. A COATED TIB2 WHISKER TOUGHENED SIC MATRIX COMPOSITE FOR AEROSPACE PROPULSION

    SBC: ATS-MER, LLC            Topic: N/A

    SILICON CARBIDE IS A VERY DESIRABLE STRUCTURAL CERAMIC BUT STATE-OF-THE-ART MONOLITHS ARE LACKING IN TOUGHNESS AND RELIABILITY. WHISKER TOUGHENING HAS NOT BEEN EFFECTIVE DUE TO THE DISAPPEARANCE OF THE SICW IN THE VERY HIGH TEMPERATURE CONSOLIDATION PROCESS. TIB2 PARTICLES HAVE BEENDEMONSTRATED STABLE IN THE SIC CONSOLIDATION PROCESS, BUT DO NOT HAVE A MAJOR IMPACT ON INCREASING TOUGHNESS AND LACK ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  3. Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    We propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  4. ACTIVE STABILITY CONTROL OF TURBINE ENGINE COMBUSTER AND COMPRESSOR

    SBC: Scientific Monitoring, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  5. Active Suppression of Resonance Interactions between Shear-Layers and Cavities

    SBC: High Technology Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  6. ACTIVE VIBRATION STABILIZATION BY SMART LEAD-FREE PIEZO CERAMIC/POLYMER HYBRID MATERIALS

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  7. Additive Manufacturing Synthesis of Novel Materials for 3000 Degree

    SBC: ATS-MER, LLC            Topic: H504

    Environmentally durable material systems capable of operating at temperatures from 1500 to 3000?C while maintaining structural integrity are enabling for future hot structure hypersonic vehicles. State-of-the-art ceramic matrix composite CMC's and other established refractories lack stability at these high temperatures. The plasma transferred arc (PTA) additive manufacturing (AM) process has dem ...

    SBIR Phase I 2014 National Aeronautics and Space Administration
  8. A DISTRIBUTED OBJECT TYPE MANAGEMENT SYSTEM FOR HETEROGENEOUS ENVIRONMENTS

    SBC: REI SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  9. A Dropsonde UAV for Atmospheric Sensing in a Turbulent Environment

    SBC: BARRON ASSOCIATES, INC.            Topic: S304

    Dropsondes are one of the primary atmospheric measurement tools available to researchers. Current dropsondes are deployed with a free fall parachute trajectory, allowing no flight path control and requiring the deployment aircraft to fly close to the target. Adding an extended, guided range capability to the dropsonde will allow much greater mission flexibility by providing significant geographi ...

    SBIR Phase I 2014 National Aeronautics and Space Administration
  10. Advanced High-Lift Systems To Enhance Performance And Utility Of Existing And New Ga Aircraft

    SBC: Innovative Aerodynamic            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government