You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DIAGNOSIS OF NATURAL AND INDUCED DISEASES OF MILITARY IMPORTANCE
SBC: Adeza Biomedical Corpon Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
PROPERTY RESTORAL ALGORITHMS FOR BLIND ADAPTATION OF RECEIVE-PATH & TRANSMIT-PATH ANTENNA ARRAYS IN GROUND-BASED COMMUNICATION SYSTEM
SBC: Adv Countermeasure Sys Topic: N/AAN SBIR PROJECT IS PROPOSED HERE TO DEVELOP NOVEL TECHNIQUES FOR DIRECTIVE/RETRODIRECTIVE COMMUNICATIONS, BY USING BLIND ADAPTATION ALGORITHMS TO ADJUST THE ARRAY WEIGHT ON THE RECEIVE/TRANSMIT PATHS OF A COMMUNICATION SYSTEM. THE PROPOSED PROCESSOR HAS THE CAPABILITY TO AUTOMATICALLY EXTRACT SIGNALS FROMTHE RECEIVED ENVIRONMENT, AND TO TRANSMIT SIGNALS BACK TO THE SIGNAL SOURCE USING AN ANTENNA P ...
SBIR Phase I 1990 Department of DefenseArmy -
VISUALIZATION OF HEURISTIC PROCESSES
SBC: Advanced Decision Systems Topic: N/ARESEARCH INTO VISUALIZATION TECHNIQUES FOR HEURISTIC PROCESSES IS PROPOSED, INCLUDING THE DESIGN OF A SOFTWARE SYSTEM IN WHICH THESE TECHNIQUES ARE IMPLEMENTED. IN ADDITION TO THE SOFTWARE ARCHITECTURE,THE SYSTEM DESIGN WILL INCLUDE A DESCRIPTION OF USER INTERFACE FUNCTIONS AND A STRATEGY FOR INTERFACING WITH EXISTING ARTIFICIAL INTELLIGENCE APPLICATIONS. EXISTING WORK IN ALGORITHM ANIMATION AND I ...
SBIR Phase I 1990 Department of DefenseArmy -
AUTOMATED SAR CHANGE DETECTION FOR COMBAT SUPPORT
SBC: Advanced Decision Systems Topic: N/AADS PROPOSES TO ADAPT AND APPLY CHANGE DETECTION PROCESURES DEVELOPED FOR THE NATIONAL INTELLIGENCE COMMUNITY TO THE PROBLEM OF SUPPORT FOR THE BATTLEFIELD COMMANDER. WE WILL BE WORKING WITH BOTH OF THE DOMINANT CHANGE DETECTION PARADIGMS WITH BOTH PIXEL LEVEL AND SYMBOLIC CHANGE DETECTION AND DETERMINING WHICH OF THE TWO OR POSSIBLE HYBRIDIZATION WILL PROVIDE THE BEST SHORT TERM CHANGE DETECTION.
SBIR Phase I 1990 Department of DefenseArmy -
A MESOSCALE MODEL FOR PREDICTING PRECIPITATION AND CLOUD COVER
SBC: Advanced Projects Research, Incorporated Topic: N/AA MULTI-DIMENSIONAL NUMERICAL MODEL FOR PREDICTING CLOUD COVER, FOG, AND HAZE UNDER BATTLEFIELD CONDITIONS IS DEVELOPED. THE PROGRAM UTILIZES REAL TIME METEOROLOGICAL DATA (WHEN AVAILABLE) TO PREDICT METEOROLOGICAL CONDITIONS OVER IRREGULAR TERRAIN. THE COMPUTER PROGRAM IS RELATIVELY SIMPLE AND EXECUTES QUICKLY ON A VARIETY OF COMPUTER SYSTEMS. PROBLEMS REQUIRING SEVERAL THOUSAND NODES CAN BE SOLV ...
SBIR Phase I 1990 Department of DefenseArmy -
SATELLITE KILL ASSESSMENT SPECTROSCOPY
SBC: Aeromet, Inc. Topic: N/ATO MEET THE KINETIC ENERGY ANTI-SATELLITE (KE ASAT) REQUIREMENTS FOR TIMELY AND RELIABLE KILL ASSESSMENT, AEROMET PROPOSES TO RECOMMEND INNOVATIVE TECHNIQUES IN REAL-TIME KILL ASSESSMENT SPECTROSCOPY. BECAUSE IT CAN BE CRITICALLY IMPORTANT TO ACCURATELY VERIFY SATELLITE ELIMINATION, A KILL ASSESSMENT SYSTEM MUST DISCERN BETWEEN VARIOUS HIT AND MISS PHENOMENA, INCLUDING THE USE OF POTENTIAL COUNTER ...
SBIR Phase I 1990 Department of DefenseArmy -
LASER DEPOSITION OF MODULATED-STRUCTURE FERROELECTRIC THIN FILMS FOR NON-VOLATILE MEMORIES
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
NEW GASKET CONCEPTS USING CONDUCTIVE COMPOSITE MATERIALS
SBC: Anamet Laboratorytories, In Topic: N/ATHE OBJECTIVE OF THIS PHASE I RESEARCH IS TO IDENTIFY LOW COST, CORROSION RESISTANT GASKET CONCEPTS AND COMPOSITE MATERIALS WHICH CAN BE USED TO HARDEN THE DOOR SEALS OF A SHELTER AGAINST EMI/EMP THREATS. THE GASKET PERFORMANCE REQUIREMENTS SPECIFIED BY THE ARMY ARE STRINGENT, BUT WITH THE RECENT DEVELOPMENT OF CONDUCTIVE POLYMERS AND FIBER REINFORCED COMPOSITE MATERIALS, SUCH REQUIREMENTS CAN BE ...
SBIR Phase I 1990 Department of DefenseArmy -
LIGHTWEIGHT COMPOSITE MATERIALS FOR EMI/EMP SHIELDING
SBC: Anamet Laboratorytories, In Topic: N/ATHE OBJECTIVE OF THIS PHASE I RESEARCH IS TO IDENTIFY A LOW COST, LIGHTWEIGHT, COMPOSITE MATERIAL WHICH CAN BE USED TO HARDEN A SHELTER AGAINST EMI/EMP THREATS. THE WEIGHT REDUCTION GOAL OF 80% OF EXISTING 30 MIL ALUMINUM SHEET IS AMBITIOUS, BUT WITH THE RECENT DEVELOPMENT OF CONDUCTIVE POLYMERS AND FIBER REINFORCED COMPOSITE MATERIALS, SUCH A GOAL IS ATTAINABLE. THE RESEARCH PROPOSED HEREIN IDENT ...
SBIR Phase I 1990 Department of DefenseArmy -
A NEW SEMI-AUTOMATIC SCRIBER (SAS) FOR RAPID INSPECTION OF BEARING COMPONENTS
SBC: Anamet Laboratorytories, In Topic: N/ATHIS SBIR PROPOSAL DEFINES AN INNOVATIVE APPROACH FOR AUTOMATING CURRENT METHODS USED FOR BEARING INSPECTION. THE PROPOSED SEMI-AUTOMATED SCRIBER (SAS) WILL RELY ON AN INSTRUCTED PROBE COUPLED TO A PC-BASED DATA ACQUISITION SYSTEM. IN THE FIRST TASK OF THE PROCESS, A SIMPLIFIED VERSION OF THIS PROBE WILL BE CONSTRUCTED AND USED ON KNOWN DEFECT TYPES AND GEOMETRY TO HELP EVALUATE THE TEST METHODS A ...
SBIR Phase I 1990 Department of DefenseArmy