You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. CONTROL ROOM INLEAKAGE TEST

    SBC: Lagus Applied Technology Inc.            Topic: N/A

    A SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES

    SBC: Expert-ease Systems            Topic: N/A

    WORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  7. IN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE

    SBC: Michael Fox            Topic: N/A

    IN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE WITH REACTOR OPERATING TIME OR AGE. THE WORK PROPOSED IS TO GATHER, REVIEW, ORGANIZE, COMPILE, C COMPUTERIZE, AND ANALYZE IN-REACTOR DATA PERTAINING ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  8. MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS

    SBC: SOHAR, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. METHODS TO UNDERSTAND AND ANALYZE AGING EFFECTS

    SBC: Sea Consultants            Topic: N/A

    N/A

    SBIR Phase I 1985 Nuclear Regulatory Commission
  10. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government