You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
ASSESSMENT OF RARE EVENT FREQUENCIES OFTEN REQUIRES SIGNIFI-CANT RELIANCE ON EXPERT JUDGEMENT DUE TO THE SCARCITY OF EMPIRICAL DATA.
SBC: Pickard, Lowe & Garrick Inc. Topic: N/AASSESSMENT OF RARE EVENT FREQUENCIES OFTEN REQUIRES SIGNIFI-CANT RELIANCE ON EXPERT JUDGEMENT DUE TO THE SCARCITY OF EMPIRICAL DATA. IN THIS WORK, FORMAL MODELS FOR USING THE OPINIONS OF SINGLE AND MULTIPLE EXPERTS WILL BE EVALUATED INLIGNT OF EMPIRICAL DATA. THE OBJECTIVE IS TO SEE TO WHAT EXTENT THE EMPIRICAL DATA "VALIDATES" THE EXPERTS' ESTIMATES, AS WELL AS THE MODELS USED FOR ANALYZING SUCH ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
BASED ON HEAT RELEASE MONITORING: A DEMONSTRATION PROGRAM
SBC: Geoscience Ltd Topic: N/ATHE PROPOSED PROGRAM CONSISTS OF THE DEVELOPMENT OF A TECHNIQUE AND A SYSTEM TO MEASURE THE RADIOACTIVE DECAY OF OF RADWASTE CONTAINED IN STORAGE CANISTERS, CASKS AND VAULTS. THE SYSTEM BEING CONSIDERED DEALS WITH THE DIRECT MEASUREMENT OF THE AFTERHEAT BEING GENERATED IN THE RADWASTEVOLUMES. THE SYSTEM TO BE USED TO ACCOMPLISH SUCH MEASURE MENTS CONSISTS OF A HEAT FLUX SENSOR ENVELOPE THAT SURROU ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
CONTROL ROOM INLEAKAGE TEST
SBC: Lagus Applied Technology Inc. Topic: N/AA SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS
SBC: SOHAR, INC. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
METHODS
SBC: Structural Analysis Topic: N/ATHE PURPOSE OF THE PROPOSED RESEACH IS TO IMPROVE THE SAFETY OF THE PIPING SYSTEMS SUBJECTED TO LOADINGS WITH A WIDE RANGE OF FREQUENCY CONTENT (E.G. PRESSURIZED THERMAL SHOCK, WATER HAMMER, AND SEISMIC LOADINGS). THIS WILL BE DONE BY SHOWING THAT THE SAFETY OF THE PIPING SYSTEMS CAN BE SIGNIFICANTLY IMPROVED BY USING NONLINEAR (INELASTIC) PROCEDURES BECAUSE OF UTILIZATION OF THE SIGNIFICANT ADDIT ...
SBIR Phase I 1986 Nuclear Regulatory Commission