Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    COMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  4. ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME

    SBC: ASCA, INC.            Topic: N/A

    THIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  5. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES

    SBC: Guyer Santin, Inc.            Topic: N/A

    THIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. CONTROL ROOM INLEAKAGE TEST

    SBC: Lagus Applied Technology Inc.            Topic: N/A

    A SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS

    SBC: SOHAR, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government