You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE
SBC: Cigital, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
NO MOVING PARTS RAIN GAUGE
SBC: THE CORE GROUP, INC. Topic: N/ATHE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...
SBIR Phase I 1994 Department of Commerce -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A STANDARD CALIBRATION MODEL FOR THE NEAR-INFRARED ANALYSIS OF GASOLINE
SBC: L T Industries Inc. Topic: N/ATHE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) HAS UNDERTAKEN AN EFFORT TO PROVIDE SOLID STANDARDS AND ALGORITHMS FOR THE STANDARDIZATION OF NEAR-INFRARED SPECTROPHOTOMETERS. THIS EFFORT, COUPLED WITH RECENT ADVANCES IN MATHEMATICAL ALGORITHMS FOR REGRESSION MODEL TRANSFER, HAS CREATED AN OPPORTUNITY FOR THE DEVELOPMENT OF STANDARD CALIBRATION MODELS. THE PROPOSED RESEARCH FOCUSES ON TH ...
SBIR Phase I 1994 Department of Commerce -
ROBUST DESIGN ENGINEERING WORKSTATION
SBC: MANAGEMENT SCIENCES INC Topic: N/AMSI PROPOSES TO INCORPORATE BACKGROUND SUBSTITUTION OF "FAULTY MODELS" IN CAD DESIGN SIMULATION OF ELECTRONIC CIRCUITS TO PERFORM A "DESIGN OF EXPRIMENTS" DETERMINATION OF SENSITIVITY TO PARAMETRIC VARIATION IN COMPONENTS. THE INFORMATION LEARNED WILL BE USED TO SELECT COMPONENTS THAT WILL HAVE A LONGER LIFE, AND GREATER DURABILITY. THIS FORM OF ANALYSIS COMBINED WITH WORST CASE SENSITIVITY ANALYS ...
SBIR Phase I 1994 Department of Commerce -
HIGH TC SUPERCONDUCTING THIN FILMS FOR TRANSFER STANDARD RADIOMETERS.
SBC: NEOCERA, LLC Topic: N/AHIGH TEMPERATURE SUPERCONDUCTING (HTSC) FILMS HAVE A LARGE POTENTIAL AS DETECTORS OF ELECTROMAGNETIC RADIATION. TO BE USEFUL FOR TRANSFER STANDARD RADIOMETERS, IT IS NECESSARY THAT THE HTSC FILM QUALITY SHOULD BE VERY HIGH, BOTH FROM THE VIEW POINTS OF STRUCTURE AND SUPERCONDUCTING PROPERTIES. A MAJOR TASK, IN ORDER TO ACHIEVE HIGH SENSITIVITY, FAST RESPONSE, LOW NOISE LEVELS, AND UNIFORM SPECTRAL ...
SBIR Phase I 1994 Department of Commerce -
A SENSITIVE, HIGH RESOLUTION IMAGING DETECTOR FOR COLD NEUTRONS
SBC: NewTek Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce