You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. Compact, Continuous Monitoring for Volatile Organic Compounds

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1998 Environmental Protection Agency
  3. Development of a Low Toxicity Treatment for Zebra Mussels

    SBC: Pharmacognetics, Inc.            Topic: N/A

    Zebra mussels cause an estimated $5 billion in economic damages annually. They clog water intake pipes, damage water supplies, threaten native fish and aquatic species, and promote the mobilization of toxic materials into the food chain. Chlorination is presently the most common treatment for zebra mussels. However, chlorine causes many serious environmental risks, thus necessitating the develo ...

    SBIR Phase I 1997 Environmental Protection Agency
  4. Development of a Multianalyte Biosensor Instrument

    SBC: Ergopedia, Inc.            Topic: N/A

    This Phase I project will develop a multianalyte biosensor field screening instrument (MBFI). The MBFI has the potential to reduce the annual cost of environmental analyses in the United States by more than $20 million and to reduce the analysis turnaround time from approximately 19 days to less than 15 minutes. The major barrier to the development of a biosensor instrument for environmental mea ...

    SBIR Phase I 1997 Environmental Protection Agency
  5. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. Disposable Micromachined Flow Immunoassay for Field Detection of Contaminants

    SBC: American Research Corporation of Virginia            Topic: N/A

    The use of enzyme-linked immunosorbent assay (ELISA) to detect contaminants such as solvents, fuels, and pesticides in soil and water samples is now well established. Although ELISA and related methods can facilitate analysis of samples, several washing and separation steps are involved that require 30 to 120 minutes per sample to reach equilibrium. Recently, near infrared fluorescence immunoassa ...

    SBIR Phase I 1997 Environmental Protection Agency
  7. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. FOURIER TRANSFORM SPECTROMETER FOR CONTINUOUS FLUE GAS MONITORING

    SBC: Remote Spectral Capture, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  10. High Performance, Low-Global-Warming Refrigerants for Domestic Refrigerators

    SBC: ENVIRONMENTAL TECHNOLOGY & EDUCATION CTR            Topic: N/A

    N/A

    SBIR Phase I 1998 Environmental Protection Agency
US Flag An Official Website of the United States Government