You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS
SBC: MISSION RESEARCH CORP. Topic: N/AHIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...
SBIR Phase I 1990 Department of Energy -
FIBER OPTIC LONG COUNTER
SBC: FIBERTEK, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
DEVELOPMENT OF INJECTION TECHNOLOGY FOR A HIGH REPETITION RATE POSITRON SOURCE
SBC: Science Research Laboratory, Inc Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
3D INSPECTION OF CIT FIRST WALL SURFACES
SBC: Intelligent Automation Systems, Inc. Topic: N/ASAFE OPERATION OF THE EXPERIMENTAL COMPACT IGNITION TOKAMAK (CIT) BEING CONSTRUCTED AT THE PRINCETON PLASMA LABORATORY REQUIRES INTEGRITY OF THE FIRST WALL SURFACES. THE GRAPHITE TILES LINING THE INTERIOR OF THE TORUS MAY CRACK, DELAMINATE, OR BREAK COMPLETELY OFF. RATHER THAN MANUALLY INSPECTING THE SURFACES OR USING DETECTION OF CONTAMINANTS IN THE PLASMA TO DETERMINE THE LOSS OF TILE INTEGRITY, ...
SBIR Phase I 1990 Department of Energy -
3D-SENSOR-AUGMENTED REMOTE MANIPULATION
SBC: Intelligent Automation Systems, Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
TORSIONAL SENSOR FOR MONITORING LIQUID LEVEL AND DENSITY
SBC: Panametrics, Inc. Topic: N/ATHE PROBLEM OF ACCURATELY MEASURING DENSITY AND LEVEL OF SALT-BEARING RADIOACTIVE LIQUIDS IS COMPLICATED BY INTERFERING VARIABLES SUCH AS TEMPERATURE PROFILE, LIQUID COMPOSITION, SENSOR FOULING BY SALT BUILDUP, THE NUCLEAR ENVIRONMENT, AND THE SIZE, ACCESS AND MAINTENANCE CONSTRAINTS IMPOSED BY THE EXISTING LARGE BURIED STORAGE TANKS. TO SOLVE THIS PROBLEM, WE PROPOSE THE USE OF ULTRASONIC TORSION ...
SBIR Phase I 1990 Department of Energy -
IMPROVED ENHANCED OIL RECOVERY PROCESSES USING NEW AND NOVEL SYNTHETIC COPOLYMERS CONTAINING LARGE AMOUNTS OF ACRYLAMIDE
SBC: R. L. Clampitt And Topic: N/AINDEPENDENTS IN THE MID-CONTINENT AREA INCLUDING OKLAHOMA AND KANSAS, NEED A NEW AND NOVEL WATER SOLUBLE POLYMER FOR INDEPTH MOBILITY CONTROL IN ENHANCED OIL RECOVERY (EOR) PROCESSES AT INTERMEDIATE TEMPERATURES OF 165 TO 200 FAHRENHEIT. PARTIALLY HYDROLYZED POLYACRYLAMIDES AND NATURAL POLYMERS HAVE HISTORICALLY BEEN THE PRODUCTS USED IN THIS REGION. AND IN ESSENTIALLY ALL OF THE EARLIER EOR PROJE ...
SBIR Phase I 1990 Department of Energy -
A NEW ELECTROSTATIC ACCELERATOR FOR POSITRON EMISSION TOMOGRAPHY
SBC: North Star Research Corp. Topic: N/ATHE OBJECTIVE OF OUR PROJECT IS TO DEVELOP NEW MEANS OF PRODUCING SHORT LIVED RADIOISOTOPES FOR POSITRON EMISSION TOMOGRAPHY (PET). THIS MEDICAL DIAGNOSTIC TECHNIQUE IS CAPABLE OF DISCERNING AND IMAGING MEDICALLY INTERESTING PHENOMENA, SUCH AS THE ACTIVITY OF VARIOUS PARTS OF THE BRAIN, OXYGEN FLOW IN THE BODY, AND OTHER QUANTITIES WHICH ARE IMPOSSIBLE TO DETERMINE BY ANY OTHER DIAGNOSTIC TECHNIQU ...
SBIR Phase I 1990 Department of Energy -
FIBER OPTIC BUS-ORGANIZED SYSTEMS FOR SENSOR DATA ACQUISITION AND VALIDATION
SBC: American Micro-optical Inc Topic: N/ATHE SUBJECT OF THIS PROPOSAL IS A NOVEL FIBEROPTIC APPROACH TO SENSOR AND ACTUATOR DATA ACQUISITION AND HANDLING, SUITABLE FOR COLLECTING AND PROCESSING CONDITION DATA FROM NUMEROUS REMOTE SENSORS AND/OR ACUATORS USED IN NUCLEAR POWER PLANTS OR ANY OTHER LARGE INSTALLATIONS. THE APPROACH IS BASED ON A TECHNIQUE FOR THE NONINVASIVE COUPLING OF INFORMATION INTO A NEW TYPE OF OPTICAL FIBER FROM THE S ...
SBIR Phase I 1990 Department of Energy -
ROBOTIC INSTALLATION OF PWR STEAM GENERATOR NOZZLE DAMS
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy