  1. A FUEL/AIR DRIVE FLUX COMPRESSOR POWER UNIT FOR ELECTROTHERMAL GUNS

    SBC: KTECH CORP.            Topic: N/A

    The Ktech Team proposes a feasibility study of a fuel/air driven flux compression power unit (FCPU) for electric guns. Through variations of inductance gradients and through changes in scale, the proposed technology will be applicable to both electrothermal/chemical and electromagnetic guns. In the Phase 1 effort, we develop simulation models to predict the performance of the flux compression po ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  2. A Megapixel Gamma Camera for Arms Control Verification

    SBC: Lexitek Inc            Topic: N/A

    Lexitek proposes to develop an imaging gamma-ray detector with 1024 x 1024 pixels for arms control verification. The proposed detector significantly enhances the resolution of fissionable material distribution without compromising energy resolution. The detector consists of a scintillating crystal and associated sensors which determine the energy and position of the scintillation with high spat ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  3. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. Batteryless Sensors for Intrusion Detection and Assessment of Threats

    SBC: Anro Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  7. FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST

    SBC: KTECH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  8. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. High Performance Dielectrics for High Energy Density Capacitors

    SBC: Aspen Systems, Inc.            Topic: N/A

    Aspen Systems proposes to develop high dielectric constant (K), low loss tellurium polymers to meet the design objectives of high energy density capacitors. In the proposed Phase I program we will apply rigorous computational chemical techniques to predict the properties of this new class of polymers. We will attempt the synthesis of the parent polymer of the tellurium family, fabricate films for ...

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  10. HOLOGRAPHIC PATTERN RECOGNITION FOR ARMS CONTROL

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    THE CONTRACTOR HAS PATENTED TECHNOLOGY FOR A UNIQUE PROCESS THAT DIRECTLY CONVERTS AN ACOUSTIC SIGNAL INTO A VISIBLE ONE IN REAL-TIME WITHOUT ELECTRONIC CIRCUITRY. THIS RELIES ON THE ACOUSTO-OPTICAL PROPERTIES OF A CONTINUOUS LAYER OF LIQUID CRYSTAL THIN FILM LAYER WHICH SERVES AS BOTH THE SENSOR AND THE DISPLAY. THE IMAGE CAN BE VIEWED DIRECTLY BY MEANS OF CCD CAMERA. HOLOGRAPHY PROVIDES FOR BOTH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency