You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. A RECUPERATOR FOR CRYOCOOLERS

    SBC: Almatech            Topic: N/A

    THIS PROJECT INVOLVES DEVELOPMENT AND VERIFICATION OF THE PERFORMANCE OF A NOVEL HEAT EXCHANGER OPERATING IN THE 98 TO 99 PERCENT THERMAL EFFECTIVENESS RANGE. HEAT EXCHANGERS FOR CRYOCOOLER APPLICATIONS USED IN HIGH ENERGY PHYSICS, REMOTE SENSING, ETC., FREQUENTLY REQUIRE THERMAL EFFECTIVENESS OF OVER 98%. THIS IS DIFFICULT TO ACCOMPLISH,PRIMARILY BECAUSE OF THE EFFECT OF THE LONGITUDINAL THERMAL ...

    SBIR Phase I 1988 Department of Energy
  3. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  5. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  7. SYSTEM FOR ECONOMICALLY PRODUCING MARGINAL DEEPWATER GAS DISCOVERIES

    SBC: Atlantia Energy Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  8. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  9. THE DEVELOPMENT OF A MULTIPLE INPUT SPECTROMETER FOR PROCESSMONITORING APPLICATIONS

    SBC: Chromex Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  10. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government