A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
CONTROL ROOM INLEAKAGE TEST
SBC: Lagus Applied Technology Inc. Topic: N/AA SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES
SBC: Future Resources Associate Inc Topic: N/ATHE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...
SBIR Phase I 1988 Nuclear Regulatory Commission -
IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA
SBC: Modeling & Computing Services Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS
SBC: SOHAR, INC. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission