You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automatic Feature Combined Track-Detect-Localize Technique

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    A progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...

    SBIR Phase I 1997 Department of DefenseNavy
  2. Simulation Based Concurrent Planning And Development System

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseNavy
  3. Antenna for GPS CCM Improvement (SPC Proposal 5179)

    SBC: System Planning Corp.            Topic: N/A

    Antijam protection for GPS receivers can be provided in a cost-effective way by restricting the antenna reception to the upper hemisphere only, thereby eliminating the majority of intentional and unintentional jamming sources in either a war- fighting context or terrorist attack scenario. Competing schemes using null- steering antennas or receiver/processor improvements are not cost effective and ...

    SBIR Phase I 1995 Department of DefenseNavy
  4. Submarine Combat System C4I and IM and M Technology

    SBC: DARLINGTON, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  5. MULTI-WARFARE ASSESSMENT PLANNING AND DEVELOPMENT

    SBC: SYSTEMS PLANNING & ANALYSIS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
  6. Image Data Mapping, Compression, Archive and Display Software

    SBC: System Quality Consultants,            Topic: N/A

    A new emphasis in naval oceanography requires the use of a graphical user interface based software tool which seamlessly integrates the multifaceted functionality required to process, archive, interactively explore, visualize, and analyze remotely sensed oceanographic data. This proposed research effort will build on a working prototype that is currently in use at the Naval Research Laboratory's ...

    SBIR Phase I 1995 Department of DefenseNavy
  7. Measuring the Effect of Drawdown on Personnel Retention

    SBC: Sag Corp            Topic: N/A

    SAG corporation proposes an econometric model to measure the effect of drawdown programs on Navy personnel retention. The model builds on previous retention research and includes a combination of behavioral and non-behavioral techniques to improve Navy's ability to accurately project future retention decisions. Innovative econometric techniques are employed to control for the effect of drawdown ...

    SBIR Phase I 1995 Department of DefenseNavy
  8. Composite Spring Propulsion System

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    Expendable mine-hunting countermeasures require a propulsion system that is acoustically and magnetically quiet while being light in weight, reliable, and inexpensive. Proposed for development and demonstration is a composite spring energy storage device. Calculations show that a spring weighing only eight pounds can deliver 1/10 horsepower for three to five minutes to power a small vehicle. The ...

    SBIR Phase I 1995 Department of DefenseNavy
  9. Integrated Data/Model Comparison Tool

    SBC: COMPUTATIONAL PHYSICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  10. Simulation Based Design for Submarine C4I Applications

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
US Flag An Official Website of the United States Government