Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. 3-D Visualization of RF Propagation in Terrain

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    3-D visualization of multiple RF fields requires innovative display techniques to overcome a number of technical challenges, including surface polygon reduction for increased graphics speed, and discrimination of multiple overlapping surfaces. The innovation in the present proposal derives from the PI's recent development of a 3-D tactical display for the Navy in which the interaction of sonar ac ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. 6-DOF Isolation and Excitation Facility

    SBC: SVS R&D SYSTEMS, INC.            Topic: N/A

    Tactical military hardware is tested and evaluated to assess performance and ensure proper operation in its anticipated field environment. A key technique involves testing the hardware placed on a test platform isolated from the laboratory environment and associated dynamic disturbances. In order to accurately assess this performance, it is vital that precise environmental disturbances are emula ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. A HIGH-SPEED OPENING, COMPACT, HIGH REPETITION RATE OPENING SWITCH

    SBC: American Research Corporation of Virginia            Topic: N/A

    A COMPACT OPENING SWITCH THAT CAN OPEN (OR TURN-ON) IN SUB-NANOSECOND TIMES WITH PEAK POWER CAPABILITY IN GW REGIME AND AVERAGE POWER CAPABILITY IN 100 KW IS SOUGHT FOR IMPLEMENTING COMPACT PULSARS. THE PHASE I PROGRAM WILL CONDUCT AN INVESTIGATION AND LITERATURE SEARCH TO DETERMINE THE OPENING SWITCH TECHNOLOGY (PLASMA, VACUUM, SOLID-STATE, ETC.) MOST SUITABLE FOR OBTAINING THE TARGET SPECIFICATI ...

    SBIR Phase I 1992 Department of DefenseArmy
  4. A Novel Non-Lethal Effects Device

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  5. A RSTA Algorithmic Framework with Uncertainty Management

    SBC: Cyber Solutions, Inc.            Topic: N/A

    One of the most challenging information management problems related to the Reconnaissance, Surveillance and Target Acquisition (RSTA) missions is the real-time spatio-temporal fusion of target-specific cues from a netwotk of multiple sensor platforms. A robust algorithmic framework is necessary to involve the multiple agents together and achieve the optimal trade-off between low false alarm rate ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. ABDUCTIVE/EXPERT SYSTEM CONTROLLER

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  7. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: Materials Modifications Inc.            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  8. ACOUSTIC ARRAY TECHNIQUE FOR WIND TUNNEL APPLICATIONS

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  9. Acoustic Sensor Simulation and Environment Technology

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...

    SBIR Phase I 1996 Department of DefenseArmy
  10. ACTIVE NOISE AND VIBRATION CONTROL FOR AUXILIARY POWER UNITS

    SBC: A-TECH CORPORATION            Topic: N/A

    THIS PROJECT ADDRESSES SYSTEMS TO REDUCE NOISE AND VIBRATIONS EMANATING FROM AUXILIAIY POWER UNITS (APUS) WHICH ARE BEING INITEGRATED INTO ARMY VEHICLES AND SHELTERS. EXCESSIVE NOISE AND VIBRATIONS ARE HARMFUL TO AND HINDER THE EFFECTIVENESS OF OPERATORS AND OCCUPANTS. IN MILITARY EQUIPMENT, IT IS ALSO BENEFICIAL TO AVOID EMANATIONS THAT MIGHT BE USED AS DETECTION SIGNATURES . THIS EXPLORATORY DEV ...

    SBIR Phase I 1992 Department of DefenseArmy
US Flag An Official Website of the United States Government