You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NEW TECHNOLOGIES FOR IMPROVED SIMULATION OF NUCLEAR WEAPON EFFECTS

    SBC: Ares Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  2. HOLOGRAPHIC PATTERN RECOGNITION FOR ARMS CONTROL

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    THE CONTRACTOR HAS PATENTED TECHNOLOGY FOR A UNIQUE PROCESS THAT DIRECTLY CONVERTS AN ACOUSTIC SIGNAL INTO A VISIBLE ONE IN REAL-TIME WITHOUT ELECTRONIC CIRCUITRY. THIS RELIES ON THE ACOUSTO-OPTICAL PROPERTIES OF A CONTINUOUS LAYER OF LIQUID CRYSTAL THIN FILM LAYER WHICH SERVES AS BOTH THE SENSOR AND THE DISPLAY. THE IMAGE CAN BE VIEWED DIRECTLY BY MEANS OF CCD CAMERA. HOLOGRAPHY PROVIDES FOR BOTH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  3. NOVEL UNDERWATER SHOCK WAVE MEASUREMENT

    SBC: KTECH CORP.            Topic: N/A

    THE PROPOSED EFFORT WILL DEVELOP AND APPLY A NEW EXPERIMENTAL APPROACH TO MEASURE UNDERWATER TIME RESOLVED SHOCK WAVE PROFILES RESULTING FROM UNDERWATER OR SURFACE DETONATIONS. EXPLICIT DATA REQUIRED TO DESCRIBE UNDERWATER SHOCK WAVE EFFECTS ON TARGETS WILL BE OBTAINED USING A RECENTLY DEVELOPED PIEZOELECTRIC POLYMER STRESS GAUGE. A UNIQUE EXPERIMENTAL CONFIGURATION IS PROPOSED, THAT WILL ALLOW SH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  4. FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST

    SBC: KTECH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. PLASMA DRIVEN WATER SHOCK

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  7. MOLECULARLY ENGINEERED POLYMERS WITH HIGH DIELECTRIC STORAGE DENSITY AND A LARGE DIELECTRIC CONSTANT

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  8. SECOND GENERATION LABORATORY SIMULATOR FOR SINGLE EVENT EFFECTS TESTING OF MICROELECTRONICS

    SBC: Daniel H. Valles & Assoc.            Topic: N/A

    WE PROPOSE TO PROVE THE SCIENTIFIC AND TECHNICAL FEASIBILITY TO USE ELECTROSTATIC ACCELERATION TO BOOST THE ENERGY OF CF-252 FISSION FRAGMENTS AS A LABORATORY SIMULATION OF COSMIC RAY EFFECTS I MICROELECTRONICS. THE PROJECT OBJECTIVE IS TO BOOST THE ENERGY SUCH THAT A LARGE FRACTION OF THE ACCELERATED IONS HAVE A RANGE IN SILICON GRATER THAN 20 MICROMETERS. THIS SOLVES A NUMBER OF PROBLEMS ASSOCIA ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
  9. INSTRUMENTATION (ADVANCED INSTRUMENTATION FOR STANDARDIZED EMP TESTING)

    SBC: ENSCO Inc            Topic: N/A

    A GREAT DEAL OF EFFORT HAS BEEN SPENT IN RECENT YEARS TO DEVELOP STANDARDIZED METHODOLOGIES FOR ACCEPTING AND VERIFYING EMP HARDENED MILITARY FACILITIES. THE FIRST OF THESE STANDARDIZATION EFFORTS TO BE PUT INTO EFFECT APPLIES TO FIXED SITE, CRITICAL, TIME URGENT C4I FACILITIES. THE REQUIREMENTS EXISTS FOR AN ADVANCED INSTRUMENTATION APPROACH THAT CAN OVERCOME THE DIFFICULT ACQUISITION ENVIRONMENT ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
  10. NUCLEAR WEAPONS EFFECTS SIMULATION (INDUCTIVE COUPLER DEVELOPMENT FOR DIRECT DRIVE SIMULATION)

    SBC: ENSCO Inc            Topic: N/A

    ONE COMMON NUCLEAR WEAPONS EFFECTS CIMULATION TECHNIQUE SIMULATES THE EMP RESPONSE OF LONG CABLES USING DIRECT CURRENT INJECTION. DIRECT CURRENT INJECTION TYPICALLY INVOLVES THE CONNECTION OF HIGH VOLTAGE PULSE SOURCES TO THE CABLES THAT ARE ATTACHED TO A MILITARY SYSTEM. A RECENTLY DEVELOPED MILITARY STANDARD SPECIFIES THAT DIRECT CURRENT INJECTION TESTING WILL BE USED IN CONJUNCTION WITH SEVERAL ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government