The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
"EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1986 Nuclear Regulatory Commission -
BASED ON HEAT RELEASE MONITORING: A DEMONSTRATION PROGRAM
SBC: Geoscience Ltd Topic: N/ATHE PROPOSED PROGRAM CONSISTS OF THE DEVELOPMENT OF A TECHNIQUE AND A SYSTEM TO MEASURE THE RADIOACTIVE DECAY OF OF RADWASTE CONTAINED IN STORAGE CANISTERS, CASKS AND VAULTS. THE SYSTEM BEING CONSIDERED DEALS WITH THE DIRECT MEASUREMENT OF THE AFTERHEAT BEING GENERATED IN THE RADWASTEVOLUMES. THE SYSTEM TO BE USED TO ACCOMPLISH SUCH MEASURE MENTS CONSISTS OF A HEAT FLUX SENSOR ENVELOPE THAT SURROU ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
ASSESSMENT OF RARE EVENT FREQUENCIES OFTEN REQUIRES SIGNIFI-CANT RELIANCE ON EXPERT JUDGEMENT DUE TO THE SCARCITY OF EMPIRICAL DATA.
SBC: Pickard, Lowe & Garrick Inc. Topic: N/AASSESSMENT OF RARE EVENT FREQUENCIES OFTEN REQUIRES SIGNIFI-CANT RELIANCE ON EXPERT JUDGEMENT DUE TO THE SCARCITY OF EMPIRICAL DATA. IN THIS WORK, FORMAL MODELS FOR USING THE OPINIONS OF SINGLE AND MULTIPLE EXPERTS WILL BE EVALUATED INLIGNT OF EMPIRICAL DATA. THE OBJECTIVE IS TO SEE TO WHAT EXTENT THE EMPIRICAL DATA "VALIDATES" THE EXPERTS' ESTIMATES, AS WELL AS THE MODELS USED FOR ANALYZING SUCH ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
METHODS
SBC: Structural Analysis Topic: N/ATHE PURPOSE OF THE PROPOSED RESEACH IS TO IMPROVE THE SAFETY OF THE PIPING SYSTEMS SUBJECTED TO LOADINGS WITH A WIDE RANGE OF FREQUENCY CONTENT (E.G. PRESSURIZED THERMAL SHOCK, WATER HAMMER, AND SEISMIC LOADINGS). THIS WILL BE DONE BY SHOWING THAT THE SAFETY OF THE PIPING SYSTEMS CAN BE SIGNIFICANTLY IMPROVED BY USING NONLINEAR (INELASTIC) PROCEDURES BECAUSE OF UTILIZATION OF THE SIGNIFICANT ADDIT ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA
SBC: Advanced Projects Research, Incorporated Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS
SBC: Advanced Systems Concepts Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission