Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: T P L, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. CONTROL VALVE CAVITATION GUIDE

    SBC: Tullis Engineering Consultants            Topic: N/A

    ONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government