Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  3. NO MOVING PARTS RAIN GAUGE

    SBC: THE CORE GROUP, INC.            Topic: N/A

    THE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...

    SBIR Phase I 1994 Department of Commerce
  4. ROBUST DESIGN ENGINEERING WORKSTATION

    SBC: MANAGEMENT SCIENCES INC            Topic: N/A

    MSI PROPOSES TO INCORPORATE BACKGROUND SUBSTITUTION OF "FAULTY MODELS" IN CAD DESIGN SIMULATION OF ELECTRONIC CIRCUITS TO PERFORM A "DESIGN OF EXPRIMENTS" DETERMINATION OF SENSITIVITY TO PARAMETRIC VARIATION IN COMPONENTS. THE INFORMATION LEARNED WILL BE USED TO SELECT COMPONENTS THAT WILL HAVE A LONGER LIFE, AND GREATER DURABILITY. THIS FORM OF ANALYSIS COMBINED WITH WORST CASE SENSITIVITY ANALYS ...

    SBIR Phase I 1994 Department of Commerce
  5. AN ASSESSMENT AND TEACHING TOOL FOR NATIONAL EDUCATION GOALS

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  6. ROLE-BASED ACCESS CONTROL

    SBC: Seta Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  7. DIODE LASER ABSOLUTE MOISTURE SENSOR

    SBC: Southwest Sciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  8. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. Electromagnetic Resonance Sensors for Determination of Moisture Content in Concrete

    SBC: American Research Corporation of Virginia            Topic: N/A

    The overall quality and the comprehensive strength, in particular, of concrete are critically dependent on the water content in the concrete mixture. It is also essential to know if the concrete has reached a stage of moisture equilibrium before surface finishes such as paint or carpet can be applied. At present, no reliable method or easy-to-use instrument exists for determining the moisture co ...

    SBIR Phase I 1995 Department of Commerce
  10. CAD of Non-linear Optical Properties of Thin-film Structures

    SBC: Autometric Inc.            Topic: N/A

    This proposal addresses development of CAD software for simulating non-linear optical materials. The software will provide a virtual lab in which experimental setups are simulated. The proposed software is based on the use of a Maxwell differential equation solver, the Finite Difference Time Domain (FDTD) method. This numerical method has been developed by numerous researchers since 1968 and no ...

    SBIR Phase I 1995 Department of Commerce
US Flag An Official Website of the United States Government