You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. A Discontinuous Fiber Composite Interlayer for Increased Brazed Joint Reliability

    SBC: Technical research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  3. ADVANCED DESIGN OF AIR-SPARGED HYDROCYCLONE SYSTEM FOR FINE COAL FLOTATION

    SBC: Advanced Processing Tech.,            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  4. Advanced NZP-Ceramic Based Thermal Barrier Coatings with Enhanced Oxidation and Thermal Shock Resistance

    SBC: VESTA SCIENCES, INC.            Topic: N/A

    99 Advanced NZP-Ceramic Based Thermal Barrier Coatings with Enhanced Oxidation and Thermal Shock Resistance--LoTec, Inc., 181 West 1700 South, Salt Lake City, UT 84115-5247; (801) 483-3100 Mr. Ramachandran Nageswaran, Principal Investigator Mr. Santosh Y. Limaye, Business Official DOE Grant No. DE-FG03-97ER82418 Amount: $74,900 High performance thermal barrier coating (TBCs) are becoming inc ...

    SBIR Phase I 1997 Department of Energy
  5. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS

    SBC: Vista Control Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  7. A Fuzzy Expert Systems-Based Standard Generalized Markup Language Interface for Access and Collaborative Authoring of Multi-Domain Technical Documents on a Wide Area Network

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  8. Aggressive, Abrasion-Resistant Cutters for Hard Rock Drill Bits

    SBC: NOVATEK            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  9. A 34 GHz High-Power Micro-Pulse Klystron

    SBC: Fm Technologies Inc            Topic: N/A

    161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...

    SBIR Phase I 1997 Department of Energy
  10. A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators

    SBC: Fm Technologies Inc            Topic: N/A

    149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government