You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ANALYSIS OF NUCLEAR WEAPONS EFFECTS ON STRATEGIC STRUCTURES
SBC: Engineering & Economics Rsrch Topic: N/ASUBSTANTIAL PROGRESS HAS BEEN MADE IN RECENT YEARS TO DEVELOP AND VALIDATE MODELS WHICH CAN PREDICT THE PHYSICAL EFFECTS OF NUCLEAR WEAPONS ON STRATEGIC STRUCTURES. SIGNIFICANT UNCERTAINTIES REMAIN, HOWEVER, IN THE CONFIDENCE LEVELS ATTRIBUTABLE TO THESE PREDICTIVE CAPABILITIES. THIS APPROACH WOULD IDENTIFY AND PRIORITIZE THOSE ACTIVITIES, ALONG WITH THEIR ASSOCIATED BUDGETARY AND SCHEDULING CONSI ...
SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency -
LASER INDUCED FLUORESCENCE MEASUREMENTS OF MAGNETIC FIELD CONTOURS IN HIGH CURRENT DEVICES
SBC: HY-Tech Research Corp. Topic: N/ATHE DISTRIBUTION OF THE MAGNETIC FIELD IN A HIGH CURRENT PLASMA DEVICE PROVIDES IMPORTANT INFORMATION ABOUT THE DEVICES OPERATION. TRADITIONAL FARADAY ROTATION, ZEEMAN EMISSION SPECTROSCOPY, AND MAGNETIC PROBE TECHNIQUES SUFFER FROM POOR SPATIAL RESOLUTION BECAUSE THE MAGNETIC FIELD EFFECT IS INTEGRATED ALONG THE LINE OF SIGHT FOR THE OPTICAL TECHNIQUE AND THE PROBES PERTURB THE PLASMAS. A LASER I ...
SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency -
DEVELOPMENT OF AN EULERIAN FINITE ELEMENT CODE
SBC: Intelligent Systems Research, Inc. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency -
NUCLEAR SURVIVABILITY AWARENESS AND TRAINING
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency -
TUNNEL HARDENING THROUGH INNOVATIVE ROCK BOLTS AND SHOTCRETE LINERS
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1987 Department of DefenseDefense Threat Reduction Agency -
NEW TECHNOLOGIES FOR IMPROVED SIMULATION OF NUCLEAR WEAPON EFFECTS
SBC: Ares Corporation Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency -
HOLOGRAPHIC PATTERN RECOGNITION FOR ARMS CONTROL
SBC: EMPIRICAL TECHNOLOGIES CORPORATION Topic: N/ATHE CONTRACTOR HAS PATENTED TECHNOLOGY FOR A UNIQUE PROCESS THAT DIRECTLY CONVERTS AN ACOUSTIC SIGNAL INTO A VISIBLE ONE IN REAL-TIME WITHOUT ELECTRONIC CIRCUITRY. THIS RELIES ON THE ACOUSTO-OPTICAL PROPERTIES OF A CONTINUOUS LAYER OF LIQUID CRYSTAL THIN FILM LAYER WHICH SERVES AS BOTH THE SENSOR AND THE DISPLAY. THE IMAGE CAN BE VIEWED DIRECTLY BY MEANS OF CCD CAMERA. HOLOGRAPHY PROVIDES FOR BOTH ...
SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency -
NOVEL UNDERWATER SHOCK WAVE MEASUREMENT
SBC: KTECH CORP. Topic: N/ATHE PROPOSED EFFORT WILL DEVELOP AND APPLY A NEW EXPERIMENTAL APPROACH TO MEASURE UNDERWATER TIME RESOLVED SHOCK WAVE PROFILES RESULTING FROM UNDERWATER OR SURFACE DETONATIONS. EXPLICIT DATA REQUIRED TO DESCRIBE UNDERWATER SHOCK WAVE EFFECTS ON TARGETS WILL BE OBTAINED USING A RECENTLY DEVELOPED PIEZOELECTRIC POLYMER STRESS GAUGE. A UNIQUE EXPERIMENTAL CONFIGURATION IS PROPOSED, THAT WILL ALLOW SH ...
SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency -
FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST
SBC: KTECH CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission