You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Energy Laser Testing of Thermal Protection Materials with a New Diagnostic

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    The Department of Defense and their contractors are currently limited in their ability to fabricate high temperature thermal protection and structural materials and include those materials in new aerospace vehicle designs without risk of thermally induced material failures which might compromise the new designs. Major improvements in structural designs will be difficult without cost effective mat ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. Computed Tomography Algorithms for Helical Scanned Data

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  3. A Cross Wind Sensor Using Optical Scintillation of a Laser Illuminated Target

    SBC: SCIENTIFIC TECHNOLOGIES CORP.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  4. Low Cost Test Methodology for High Temperature Materials using Military R&D Lasers

    SBC: Schafer Corporation            Topic: N/A

    The problem facing many U. S. high temperature material vendors is the high cost and long span times required for testing with "conventional" techniques. The higher the heat flux required for the test, the more expensive the test, and the more elaborate the facility required. The cost and schedule required for testing by "conventional" means becomes a global competitiveness problem for U. S. hig ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. Economical and Reliable Adaptive Disturbance Cancellation for Lightly Damped Systems

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    Efforts to apply active noise and vibration control commercially, while intensifying, continue to be hampered by the cost of the computers required to implement the active algorithms. Currently, the cost of wide-band control is prohibitive for lightly damped systems such as precision structures or highly reverberant acoustic spaces, even if the system has just one canceling actuator and one error ...

    SBIR Phase I 1997 Department of DefenseAir Force
  6. Virtual Environment Training for Trauma Management

    SBC: HT Medical Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  7. KQML Servers for Knowledge Based Engineering Information System

    SBC: CRYSTALIZ, INC.            Topic: N/A

    The concurrent engineering of acquired subsystems is a unique problem faced by many large manufacturers. Examples abound in the auto, aerospace, and machine tool industries. As these manufacturers push the performance characterstics of their final product they must concurrently engineer the product as they help their suppliers engineer the sub-systems. To address this problem, a distributed produc ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  8. Post Exposure Bake Monitoring of Chemically Amplified Resists Using Scatterometry

    SBC: Sandia Systems, Inc.            Topic: N/A

    We will demonstrate the capability of scatterometry to provide a process monitor to post exposure bake of chemically amplified photoresist. Two or more scatterometers will be designed that are capable of monitoring the intensities of multiple diffraction orders that result from illuminating device patterns of photoresist. The goal is to demonstrate the capability of scatterometry to provide a PEB ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  9. Automatic Feature Combined Track-Detect-Localize Technique

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    A progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...

    SBIR Phase I 1997 Department of DefenseNavy
  10. Gamma Ray Lens Feasibility Study

    SBC: Acctek Associates, Inc.            Topic: N/A

    Ganuna (7)-ray lenses are an advanced technology currently under development at Argonne National Laboratory for arms control application. The purpose of this proposal is to address whether y-ray lens technology can enable an improved system for imaging radioactive isotopes in patients. In nuclear medicine, it is often desirable to generate a y-ray image that shows the exact areas where an emitting ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government