You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Virtual Environment Training for Trauma Management

    SBC: HT Medical Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  2. Automatic Feature Combined Track-Detect-Localize Technique

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    A progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...

    SBIR Phase I 1997 Department of DefenseNavy
  3. N/A

    SBC: ARTIS, L.L.C.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  4. A Rapid Test for Interferon alpha To Screen Viral from Bacterial Infections

    SBC: CYTIMMUNE SCIENCES, INC.            Topic: N/A

    Establishing interferon-a as a surrogate marker of viral infection will enable the differential diagnosis of viral vs bacterial infections. Such information will be critical to subsequent treatments. The current proposal is designed to evaluate CytImmune Science's patent pending technology for cytokine measurement in biological fluids. The technology overcomes the presence of cytokine binding p ...

    SBIR Phase I 1995 Department of DefenseNavy
  5. Simulation Based Concurrent Planning And Development System

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseNavy
  6. N/A

    SBC: INFORMATION EXTRACTION & TRANSPORT, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  7. N/A

    SBC: Intelligent Automation, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  8. Improved Hull Form Patrol Combatant

    SBC: MARITIME APPLIED PHYSICS CORPORATION            Topic: N/A

    A concept design will be performed to allow the conversion of a 160-foot Athena Class Gunboat (PG) to a HYSWAS hull form. This work will be performed by the same team of personnel who designed and built the 27-foot HYSWAS demostration vessel QUEST under an earlier Phase II SBIR. The proposed design will provide high endurance, speeds above 40 knots in sea state 5, a large payload fraction a ...

    SBIR Phase I 1997 Department of DefenseNavy
  9. Synthesis of Nanoscale Powders In Supercritical Fluids

    SBC: Nanophase Technologies Corp            Topic: N/A

    Nanoscale powders with narrow particle-size distributions significantly reduce sintering time and temperature during the processing of high performance coatings and structural ceramics; their superplastic behavior can be exploited to net-shape form structures. Nanoscale powders can be made by a variety of methods but production scale, cost effective, environmentally sound methods are required. A s ...

    SBIR Phase I 1995 Department of DefenseNavy
  10. Antenna for GPS CCM Improvement (SPC Proposal 5179)

    SBC: System Planning Corp.            Topic: N/A

    Antijam protection for GPS receivers can be provided in a cost-effective way by restricting the antenna reception to the upper hemisphere only, thereby eliminating the majority of intentional and unintentional jamming sources in either a war- fighting context or terrorist attack scenario. Competing schemes using null- steering antennas or receiver/processor improvements are not cost effective and ...

    SBIR Phase I 1995 Department of DefenseNavy
US Flag An Official Website of the United States Government