You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Agent-based Reduction of Information Density (ARID)
SBC: 21ST CENTURY SYSTEMS, INC. Topic: AF06031Information overload and cluttered user interfaces cause decreased situational awareness and lowered performance of the human operators. Irrelevant data increases searching times for tasks requiring the identification of threats, causing delayed decisions. Cognitive burden on the user increases as displays become more cluttered, which results in increased operator stress leading to poorer decisi ...
SBIR Phase I 2006 Department of DefenseAir Force -
Culture and Modeling of Routine and Non-Routine Behavior
SBC: 21ST CENTURY SYSTEMS, INC. Topic: SOCOM06014Crowd management is an important task for civilian, police, and military groups that can be very difficult on its own, and becomes even more difficult in hostile environments. The difficulty comes from the many levels of granularity that events can happen at. Making such a system automated adds further challenges, due to difficulties with modeling and sensors. Accurate large-scale crowd models are ...
SBIR Phase I 2006 Department of DefenseSpecial Operations Command -
Intelligent Agent Toolset for 4D/RCS Architectures
SBC: 21ST CENTURY SYSTEMS, INC. Topic: N/AThere is an increasing demand for systems with more autonomous operations interacting with other autonomous and human-based systems. What is needed is an architecture bundled with developer tools for the creation of intelligent real-time control systems that marry the talents of modern control theory, software technology, sensory processing, and semantic knowledge representations. It would be a st ...
SBIR Phase I 2006 Department of CommerceNational Institute of Standards and Technology -
BattleView: A Distributed System for Intelligent Integrated Hypermedia Presentation Services for the Digital Battlefield
SBC: DEUMBRA, INC. Topic: N/AA number of applications in other commercial as well as military sectors require that multiple distributed data sources be consulted when a specific need arises, and that the results of these consultations be presented to the user. Often, these results are complex and involve multiple documents. Presentation of such results involves automatically generating browsable documents so that the user c ...
SBIR Phase I 1996 Department of DefenseArmy -
SCALABLE MULTIMEDIA DATABASE INTEGRATION AND VISUALIZATION TECHNOLOGY
SBC: DEUMBRA, INC. Topic: N/AIn this proposal, we will develop a uniform framework, called a multimedia mediator, for integrating and querying multimedia data as well as heterogenous data located on a distributed network. The multimedia mediator will use distributed computing technology to scale up to real-world applications. We will develop graphical query languages and query engines whereby an end-user can query a system ...
SBIR Phase I 1996 Department of DefenseNavy -
Data Mining and Integration Technologies for Information Exploitation
SBC: DEUMBRA, INC. Topic: N/AWe shall deliver an information exploitation demonstration prototype simulatirsg actual rlata exploitation. Within this prototype we shall deliver five different types of capabilities. The first three capabilities are data mining tools. These tools shall demonstrate the capability of identifying electronic patterns or f ingerprints in data, relationships between data, and visualizations of such ...
SBIR Phase I 1997 Department of DefenseAir Force -
Data Mining Techniques for Plan Sentinel Development
SBC: DEUMBRA, INC. Topic: N/AWe propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...
SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency -
DEVELOPMENT OF IMPROVED CO(2) SCRUBBERS FOR USE IN RESPIRATORS
SBC: Abel Company Topic: N/APHASE I OF THIS STUDY WILL VERIFY THE FEASIBILITY OF MAKING SUBSTANTIAL IMPROVEMENTS IN CO(2) SCRUBBER MATERIALS TO ALLOW SAFE AND EFFECTIVE USE UNDER CONDITIONS OF HIGH METABOLIC ENERGY EXPENDITURE PRODUCING CO(2E EXHALATION RATES IN EXCESS OF 2 LITERS PER MINUTE. THE FEASIBILITY STUDY WILL EXAMINE TWO APPROACHES: (1) MODIFICATION OF CA(OH)(2)-BASED ABSORBENTS TO ALLOW DRY STORAGE WITHOUT DECREAS ...
SBIR Phase I 1988 Department of Health and Human Services -
SURGICAL INSTRUMENT DECONTAMINATION UNIT
SBC: Abel Company Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseArmy -
Low-Loss HTS Coil System for High Energy Physics Detector Applications
SBC: Ability Engineering Technology Topic: N/A177 Low-Loss HTS Coil System for High Energy Physics Detector Applications--Ability Engineering Technology, Inc., 16140 Vincennes Avenue, South Holland, IL 60473-1283; Mr. Michael W. Morgan, Principal Investigator Mr. Joseph A. Zawistowski, Business Official DOE Grant No. DE-FG02-97ER82307 Amount: $75,000 The use of high-temperature superconducting (HTS) coils (those that superconduct when co ...
SBIR Phase I 1997 Department of Energy