You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Water Sensor for Unmanned Aerial Vehicles
SBC: SOUTHWEST SCIENCES INC Topic: N/A40444 November 18, 1996 Southwest Sciences, Inc. Increasing energy consumption and environmental degradation may contribute to deleterious changes in the radiative balance and chemical composition of the atmosphere. The quantitative measurement of water vapor in the troposphere and lower stratosphere is crucial for the study of meteorological and climati ...
SBIR Phase II 1997 Department of Energy -
Advanced Water Sensor for Unmanned Aerial Vehicles
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS
SBC: Vista Control Systems, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A FUEL/AIR DRIVE FLUX COMPRESSOR POWER UNIT FOR ELECTROTHERMAL GUNS
SBC: KTECH CORP. Topic: N/AThe Ktech Team proposes a feasibility study of a fuel/air driven flux compression power unit (FCPU) for electric guns. Through variations of inductance gradients and through changes in scale, the proposed technology will be applicable to both electrothermal/chemical and electromagnetic guns. In the Phase 1 effort, we develop simulation models to predict the performance of the flux compression po ...
SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency -
A HIGH POWER SOLID-STATE AMPLIFIER
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS
SBC: Amparo Corp.on Topic: N/APHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...
SBIR Phase I 1994 Department of Energy -
Alternative Metal Forming Using Laser Engineered Net Shaping
SBC: OPTOMEC, INC. Topic: N/A50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...
SBIR Phase I 1997 Department of Energy -
A MULTIMEDIA TUTORIAL FOR CHARGED-PARTICLE BEAM DYNAMICS
SBC: Whistlesoft Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System
SBC: Vista Control Systems, Inc. Topic: N/A145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...
SBIR Phase I 1997 Department of Energy -
An Improved Plasma Opening Switch for DECADE
SBC: NumerEx Topic: N/ACURRENT ATTEMPTS TO USE THE PLASMA OPENING SWITCH (POS) FOR DECADE HAVE NOT YET BEEN ENTIRELY SUCCESSFUL DUE TO THE APPARENT INABILITY OF THE SWITCH TO OPEN EFFICIENTLY TO A HIGH-IMPEDENCE LOAD. RESEARCH DIRECTED TOWARD IMPROVING THE PERFORMANCE OF THE POS IN THE LONG-CONDUCTION TIME REGIME HAS BEEN FRUSTRATED BY THE INABILITY OF COMPUTATIONAL TOOLS TO OPERATE IN THE PARAMETER REGIMES OF INTEREST ...
SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency