You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  2. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government