You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. INVESTIGATION OF AN AUDIO FEEDBACK SYSTEM ALLOWING VISUALLY IMPAIRED ACCESS TO GRAPHICAL USER INTERFACES

    SBC: Atg            Topic: N/A

    THE PROLIFERATION OF GRAPHICAL USER INTERFACES (GUIS) IN PERSONAL COMPUTERS, SUCH AS MICROSOFT WINDOWS AND MACINTOSH, IS A THREAT TO VISUALLY IMPAIRED PERSONS' ABILITY TO USE COMPUTERS BECAUSE GUIS REPRESENT INFORMATION ICONICLY AND SPATIALLY, AS WELL AS TEXTUALLY. THE GUIS VISUAL ORIENTATION MAKES GUIS DIFFICULT FOR THE VISUALLY IMPAIRED TO ACCESS THROUGH TRADITIONAL ASSISTIVE TECHNOLOGIES. WE PR ...

    SBIR Phase I 1993 Department of Education
  3. Development of Spatial Skills: Linking Software and Physical

    SBC: ChainWave Systems, Inc            Topic: N/A

    This research will explore the use of a virtual polyhedron modeling environment which creates nets, or patterns, for a polyhedron created on the screen, in the teaching of geometry and spatial skills. When the net is printed, cut, folded, and glued together, a 3-dimensional model of the original polyhedron is created. We propose to examine the use of this tool in an instructional setting, to dete ...

    SBIR Phase I 1997 Department of Education
  4. OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT

    SBC: Charles River Analytics, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  5. INDIVIDUALIZED INTERACTIVE VIDEO

    SBC: Duffy Engineering            Topic: N/A

    PROVIDING INDIVIDUALIZED INSTRUCTION FOR DISABLED STUDENTS IN SPECIAL EDUCATION PLACEMENTS IS A TIME-CONSUMING PROCESS FOR EDUCATORS AND THUS COSTLY. COMPUTERIZED AND INTERACTIVEVIDEODISK EDUCATIONAL FORMATS MAY NOT BE READILY CUSTOMIZED FOR THE INDIVIDUAL STUDENT. HOWEVER, COMMONLY-AVAILABLE IN PERSONAL COMPUTERS AND HAND-HELD CAMCORDERS ARE TOOLS AVAIL ABLE IN MOST SCHOOLS. IF A PERSONAL COMPUTE ...

    SBIR Phase I 1988 Department of Education
  6. DEVELOPING "JUMP START": FAMILY LITERACY KITS IN SCHOOL PROGRAMS K-3

    SBC: Early Childhood Assoc Inc.            Topic: N/A

    THIS PHASE I SBIR (92-024) PROPOSAL WILL DEVELOP "JUMP START", A SERIES OF LITERACY-ORIENTED PARENT/CHILD INTERACTION KITS TARGETING SCHOOL-AGED CHILDREN (K-3), FAMILIES AND TEACHERS. "JUMP START" KITS ARE ORGANIZED IN THREE CATEGORIES: (1) GETTING DOWN TO BASICS (COOKING, SEWING, PLANTING, LETTERS, TELEPHONING), (2) HOT TOPICS (MEASURING, WIND, DINOSAURS, MAGNETS), AND (3) ART WORKS (RUBBER STAMP ...

    SBIR Phase II 1993 Department of Education
  7. TALKING WITH CHILDREN

    SBC: Early Childhood Assoc Inc.            Topic: N/A

    TALKING WITH CHILDREN ADDRESSES A SUBSTANTIAL NEED FOR INNOVATIVE TRAINING STRATEGIES THAT IMPROVE THE COMPETENCE OF TEACHER AIDES (TA'S) IN STRATEGIES KNOWN TO PROMOTE LANGUAGE PRODUCTION AND ACQUISITION IN STUDENTS (K-3) WITH LIMITED ENGLISH PROFICIENCY (LEP). PHASE I. OBJECTIVES FOR TALKING WITH CHILDREN ARE TO PRODUCE: AN ANNOTATED CURRICU ...

    SBIR Phase I 1994 Department of Education
  8. A MULTI-PLATFORM COMPUTER-ASSISTED INDIVIDUAL FAMILY SERVICEPLAN FOR EARLY INTERVENTION PROGRAMS

    SBC: Educom Inc            Topic: N/A

    THIS PROJECT IS DESIGNED TO DEVELOP A COMPUTER-ASSISTED METHOD OF DEVELOPING THE INDIVIDUAL FAMILY SERVICE PLAN (IFSP) REQUIRED OF EARLY INTERVENTION PROGRAMS AS PART OF THE 1986 EDUCATION OF THE HANDICAPPED ACT. BECAUSE OF THE CONSTANTLY CHANGING DEVELOPMENTAL PHASES OF THE BIRTH TO FIVE YEAR OLD POPULATION, SPECIFIC LONG TERM ACHIEVEMENTS ARE VERY DIFFICULT FOR PROFESSIONALS TO PREDICT. AS A RES ...

    SBIR Phase I 1990 Department of Education
  9. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    THE PROPOSED RESEARCH ADDRESSES THE APPLICATION OF ESI'S ENHANCED PARTICLE REMOVAL TO THE NON-DESTRUCTIVE DECONTAMINATION OF NUCLEAR EQUIPMENT. IN THIS PROCESS, THE PART TO BE CLEANED IS CONTACTED, UNDER CONDITIONS OF SHEAR, WITH A SOLUTION OF A HIGH MOLECULAR WEIGHT FLUOROCARBON SURFACTANT IN AN INERT PERFLUORINATED LIQUID. IT IS THEN RINSED WITH PERFLUORINATED LIQUID AND AIR DRIED. THE PERFLUORI ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  10. RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.

    SBC: General Research And Analysis            Topic: N/A

    FOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...

    SBIR Phase I 1988 Department of Education
US Flag An Official Website of the United States Government