You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    THE PURPOSE OF PHASE I OF THIS RESEARCH PROJECT IS TO CRITICALLY REVIEW THE EXISTING COMPUTERIZED EOP SYSTEMS FOR BOTH PWR AND BWR PLANTS, DEVELOPED BY VARIOUS NATIONAL AND INTERNATIONAL ORGANIZATIONS TO FULLY UNDERSTAND THEIR ADVANTAGES, DISADVANTAGES AND LIMITATIONS IN TERMS OF THEIR IMPACT ON OPERATORS PERFORMANCE AND RELIABILITY AND RECOMMEND ONE SYSTEM OR A COMPOSITE OF SEVERAL SYSTEMS, BEFOR ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  2. REAL-TIME COLLECTION OF OPERATIONAL DATA TO SUPPORT RISK-BASED OPERATION REGULATION AND INSPECTIONS AT NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    COMPUTERIZED DATA COLLECTION DEVICES EXIST AND ARE BEING USED IN VARIOUS APPLICATIONS AT SOME NPPS FOR SYSTEMS AND EQUIPMENT NOT INSTRUMENTED IN THE CONTROL ROOM. HOWEVER, CURRENT APPLICATIONS IN THE NUCLEAR POWER INDUSTRY ARE RATHER SPORADIC AND NOT EXPLOITING THE FULL POTENTIAL OF THE TECHNOLOGY. FOR EXAMPLE, SEVERAL DIFFERENT NPPS USE SUCH SYSTEMS FOR SINGLE- PURPOSES SUCH AS TRENDS IN EQUIPMEN ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  3. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    A TWO-DIMENSIONAL NUMERICAL MODEL BASED ON A HYBRID FINITE ELEMENT METHOD WITH MESH ADAPTATION IS PROPOSED TO CALCULATE GROUNDWATER FLOW AND POLLUTANT TRANSPORT IN UNSATURATED POROUS MEDIA. THE ALGORITHM IS MODIFIED TO ENHANCE COMPUTATIONAL SPEED AND STORAGE, AND INCORPORATES PETROV-GALERKIN WEIGHTING FOR THE ADVECTION TERMS. NONLINEARITIES ASSOCIATED WITH UNSATURATED SOIL PROPERTIES, ATMOSPHERIC ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  5. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    THIS RESEARCH WILL EXECUTE AN INDEPTH STUDY OF THE BASIC FEATURES OF EMBEDDED SYSTEM AND PLANT PROCESS SOFTWARE, INCLUDING ITS INTERACTIONS WITH THE HARDWARE SYSTEMS THAT IT IS INTENDED TO CONTROL AND REGULATE. THE PURPOSE OF SUCH A STUDY WILL BE TO IDENTIFY THE PROCEDURES AND ANALYTICAL TECHNIQUES, TO BE INTEGRATED IN AN EMBEDDED SYSTEM SOFTWARE ANALYSIS METHODOLOGY, THAT CAN BE OF GREATEST UTILI ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  6. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    THIS RESEARCH PROPOSAL DEALS WITH THE DEVELOPMENT OF A GAMMARAY DOSIMETER THAT IS BASED ON A SOLID STATE DETECTOR AND A MICROPROCERSSOR AND WILL DISPLAY THE DOSE AND DOSE RATE OF THE SKIN, AT A GIVEN DEPTH OF THE BODY OR THE BODY-AVERAGED DOSE, BY MEASURING THE SPECTRUM OF A RADIATION FIELD AND CALCULATING THE TISSUE EQAUIVALENT DOSE OF INTEREST. THE DETECTOR IS A PROPRIETARY DESIGN FEATURES OF TH ...

    SBIR Phase II 1991 Nuclear Regulatory Commission
  7. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. ADVANCED METHODS FOR MODELING TEAM EFFECTS ON CONTROL-ROOM OPERATOR PERFORMANCE IN REAL-TIME

    SBC: ASCA, INC.            Topic: N/A

    THIS RESEARCH SEEKS THE DEVELOPMENT AND DEMONSTRATION OF A MODEL THAT REPRESENTS THE GROUP DECISION-MAKING PROCESSES TAKING PLACE INSIDE THE CONTROL ROOM OF A NUCLEAR POWER PLANT UNDER BOTH NORMAL AND ABNORMAL OPERATING CONDITIONS. COGNITIVE DECISIONS, TEAM EFFECTS, AND DYNAMIC FEATURES ARE AMONG THE MAJOR ISSUES THAT WILL BE ADDRESSED IN THE PROJECT. THE BASIC TOOL TO BE USED IS THE INFLUENCE DIA ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  9. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  10. OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: N/A

    THE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government