You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. Development of a Highly Realistic, Fine-Grained, Low-Cost

    SBC: Knowledge Matters, Inc.            Topic: N/A

    Today's extremely powerful, low-cost computer systems offer tremendous potential as learning tools. However, development of high quality educational software, particularly simulations, lags behind. This research will explore the issues in creating highly realistic, very detailed simulations directly targeted for educational purposes. The domain simulated will be a small retail business. This do ...

    SBIR Phase I 1997 Department of Education
  4. DEVELOPMENT OF A NEURAL NETWORK-BASED INCLUSION SIMULATION MODEL

    SBC: Syndicates Inc.            Topic: N/A

    VARIABLES THAT MIGHT LEAD TO WIDER ADOPTION OF INTEGRATED PRESCHOOL PROGRAMS INCLUDE EXPANSION OF THE WAY IN WHICH WE MAKE DECISIONS AND THE MANNER IN WHICH RELATED SERVICES ARE DELIVERED. EVALUATION EFFORTS SHOULD BE EXPANDED TO INCLUDE THE IMPACT OF VARYING METHODS OF INTEGRATION. THIS PROJECT PROPOSES THE DEVELOPMENT OF A COMPUTER INCLUSION SIMULATION MODEL THROUGH THE UTILIZATION OF NEURAL N ...

    SBIR Phase I 1994 Department of Education
  5. Development of Spatial Skills: Linking Software and Physical

    SBC: ChainWave Systems, Inc            Topic: N/A

    This research will explore the use of a virtual polyhedron modeling environment which creates nets, or patterns, for a polyhedron created on the screen, in the teaching of geometry and spatial skills. When the net is printed, cut, folded, and glued together, a 3-dimensional model of the original polyhedron is created. We propose to examine the use of this tool in an instructional setting, to dete ...

    SBIR Phase I 1997 Department of Education
  6. Effective Math Instruction for Adult Learners on CD-ROM

    SBC: CompuTaught, Inc.            Topic: N/A

    The goal of this project is to improve remedial math instruction for adults by combining (a) an effective adult education model; (b) an effective instructional design method, with; (c) the multimedia capabilities of the computer. The innovative combination of these components will produce an effective math program designed specifically for adult learners that can be used at home, at school, or ...

    SBIR Phase I 1997 Department of Education
  7. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. Modifying Apprentice Training Programs in Industrial Maintenance and repair for the visually disabled

    SBC: Technical Resource Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Education
  10. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government