You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  3. A Portable Gamma Spectrometer with a High Resolution CdTe Array Detector

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  4. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. High Energy Density Polymer Film Capacitors

    SBC: SIGMA TECHNOLOGIES INTERNATIONAL GROUP, INC.            Topic: N/A

    Pulsed power systems for electric armament and compact weapons require increasingly smaller energy delivery systems and higher levels of reliability and component safety. Although new capacitor technologies such as double layer and electrostatic supercapacitors promise energy densities higher than 10J/cc, liquid impregnated film dielectrics with energy densities of 2.5J/cc, continue to be the sta ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  6. Electrostatic Supercapacitor

    SBC: SIGMA TECHNOLOGIES INTERNATIONAL GROUP, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government