You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB).

    SBC: Ei International Inc.            Topic: N/A

    ENERGY INCORPORATED (EI) PROPOSES TO ESTABLISH A PROGRAM TO GATHER PLANT-SPECIFIC DATA FOR THE NUCLEAR PLANT DATA BANK (NPDB). THE REQUIRED INFORMATION INCLUDES GEOMETRIC AND OPERATING DATA FOR THE PRIMARY SYSTEM SECONDARY SYSTEM, BALANCE OF PLANT, AND THE TRIP AND CONTROL SYSTEMS. ALTHOUGH, EVERY COMMERCIAL REACTOR IN THE U.S. HAS UNIQUE DESIGN FEATURES, MANY SHARE A COMMON BASIS BY WHICH THEY CA ...

    SBIR Phase I 1984 Nuclear Regulatory Commission
  4. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT

    SBC: Ybarrondo & Associates            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government