You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACOUSTIC DETECTION OF AXLES

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PHASE I RESEARCH IS TO DETERMINE THE FEASIBILITY OF UTILIZING ACOUSTIC RADIATION FROM VEHICLE TIRES TO PROVIDE A LOW COST, EASY TO DEPLOY, UNOBTRUSIVE, RELAIBLE REPLACEMENT FOR THE CURRENT METHOD OF COLLECTING VEHICLE AXLE PASSAGE DATA. THE PROPOSED METHOD WILL CROSS-CORRELATE THE TIRE NOISE RECEIVED AT SPATIALLY SEPARATED MICROPHONES TO LOCATE AXLE CROSSINGS. THE PROCESSING ...

    SBIR Phase I 1994 Department of Transportation
  2. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. AIRCRAFT INSPECTOR VISUAL TRAINING PROGRAMS USING COMPUTER-ENHANCED IMAGES

    SBC: Blackmon & Assoc            Topic: N/A

    DEMONSTRATE THE FEASIBILITY OF TRAINING AND UPGRADING AIRCRAFT INSPECTOR SKILLS THROUGH THE USE OF COMPUTER ENHANCED IMAGES OF AIRCRAFT COMPONENTS IN A CONTROLLED INSTRUCTIONAL ENVIRONMENT.

    SBIR Phase I 1994 Department of Transportation
  4. A Low Cost Fire-Retardant Material Alternative for School Buses

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  5. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  7. Electrical Ground Loops in Heavy Trucks

    SBC: Vehicle Enhancement Systems,            Topic: N/A

    The number of electrical/electronic devices in heavy-duty vehicles are increasing rapidly. Many of these devices require a "clean" source of power, which may theoretically be supplied by a separate ground. Currently, tractors operate on one of three grounding methods, the frame ground being the most common. However, the introduction of a separate ground into the trailer could lead to serious gr ...

    SBIR Phase I 1996 Department of Transportation
  8. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  9. High Resolution Data Sources and Applications for Transportation Planning

    SBC: Shenandoah Mountain            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  10. Highway Capacity Software in Portable Graphical User Interface (GUI) Format

    SBC: Catalina Engineering, Inc.            Topic: N/A

    The Highway Capacity Software (HCS) has, for the past 10 years, been the principal tool for applying the analysis methods of the Highway Capacity Manual (HCM). The HCS has been DOS-based with a very limited user interface. With a number of new research materials being produced, and an approved plan in place which leads to publication of an HCM 2000 and accompanying software, there is a strong op ...

    SBIR Phase I 1996 Department of Transportation
US Flag An Official Website of the United States Government