You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. An Integrated Visualization of Nuclear Weapons Effects for DIS Applications

    SBC: Visidyne, Inc.            Topic: N/A

    One of the most challenging problems in adding realism to the battlefield environment in DIS Exercises is treatment of the dynamic physical materials and processes resulting from battlefield munitions (i.e., battlefield smoke and dust, blast and shock damage to buildings, cratering of terrain and roadways, etc.). Currently, there is no alteration of terrain and cultural features due to nuclear we ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  3. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. A Portable Gamma Spectrometer with a High Resolution CdTe Array Detector

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  5. Compact, Rugged, Flexible Fiber Optic Interferometer for Sensitive Gas and P

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    Alameda Applied Sciences Corporation (AASC) proposes to develop a new type of interferometer that is compact and portable and can be used to make in-situ measurements of gases and plasmas. This interferometer uses polarization maintaining optical fibers and diode lasers to duplicate the capabilities of existing Mach-Zender interferometers that use dicrete optical elements such as mirrors, lenses ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  6. CONTROL ROOM INLEAKAGE TEST

    SBC: Lagus Applied Technology Inc.            Topic: N/A

    A SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. Development of a Differential Interferometric Technique for Measuring Magnetic Field Profiles in a Plasma Radiation Source

    SBC: HY-Tech Research Corp.            Topic: N/A

    The current distribution in plasma radiation sources is both a yardstick for measuring the coupling efficiency of the generator, and a means of studying the implosion dynamics of the load. Since the current distribution cannot be directly measured, it must be deduced from the magnetic field profile. Magnetic field distributions, based on the Faraday rotation of polarized laser light, are typical ...

    SBIR Phase I 1995 Department of DefenseDefense Threat Reduction Agency
  8. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. Diamond Fast Opening Switch for High Voltage, High Average Power X-Ray, Elec

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    Alameda Applied Sciences Corporation (AASC) proposes to develop an all-solid-state, compact, portable, multi-gigawatt poer modulator for electron and ion beam diodes, high power microwave and x-ray sources. This modulator is based on Inductive Energy Store (IES) using an array of Diamond Opening Switches for power compression. Because power amplification using IES requires a much smaller volume ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government