You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    AS A RESULT OF RECENT PROBLEMS SUCH AS THE OIL LOSS PHENOMENON IN SOME MODELS OF ROSEMOUNT PRESSURE TRANSMITTERS, THE NUCLEAR INDUSTRY HAS BECOME INTERESTED IN FIBER OPTIC PRESSURE TRANSMITTERS. THESE TRANSMITTERS ARE POTENTIAL CANDIDATES TO REPLACE THE EXISTING PRESSURE TRANSMITTERS IN THE SAFETY AND NON-SAFETY SYSTEMS OF NUCLEAR POWER PLANTS. FURTHERMORE, FIBER OPTIC PRESSURE TRANSMITTERS MAY BE ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  4. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  7. INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING.

    SBC: Salvonics Inc.            Topic: N/A

    INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING. BECAUSE THE RESULTS OF RADIATION DAMAGE, INCREASED YIELD STRENGTH AND DECREASED TOUGHNESS ARE SIMILAR, AN INVESTIGATION IS PROPOSED TO EXAMINE THE FEASIBILITY OF USING THE SEEBECK EFFECT IN THE ASSESSMENT OF RADIATION DAMA ...

    SBIR Phase I 1984 Nuclear Regulatory Commission
  8. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. ROBOTICS APPLICATION FOR EXPOSURE REDUCTION

    SBC: Remotec Inc.            Topic: N/A

    THE PURPOSE OF THIS PROJECT IS TO ASSESS THE STATE-OF-THE ART OF COMPUTERIZED ROBOTS TO DETERMINE WHETHER COST/ BENEFICIAL APPLICATIONS CAN BE MADE IN NUCLEAR PLANT MAINTENANCE AND IF SUCH APPLICATIONS ARE POSSIBLE, TO DEVELOP A PLAN TO SUBSTANTIATE THE COST/BENEFIT ANALYSIS AND TO IDENTIFY THE FACTORS, IF ANY, WHICH WOULD INHIBIT NEAR-TERM ADAPTION OF ROBOT TECHNOLOGY IN NUCLEAR PLANT MAINTENANCE ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government