You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Batteryless Sensors for Intrusion Detection and Assessment of Threats

    SBC: Anro Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  2. Grid System Matrix for EMP Transient Protection

    SBC: APPLIED CONCEPT RESEARCH, INC.            Topic: N/A

    NEMP (Nuclear Electro-Magnetic Pulse), lightning strikes, high powered EMI (Electro-Magnetic Induction), or ESD (Electro-Static Discharge) can impress high transient voltages on wires connecting to electronic modules. These transients are potentially destructive to aircraft electronic components and can result in system failures. To eliminate or substantially reduce the effects of transients on ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  3. High Performance Dielectrics for High Energy Density Capacitors

    SBC: Aspen Systems, Inc.            Topic: N/A

    Aspen Systems proposes to develop high dielectric constant (K), low loss tellurium polymers to meet the design objectives of high energy density capacitors. In the proposed Phase I program we will apply rigorous computational chemical techniques to predict the properties of this new class of polymers. We will attempt the synthesis of the parent polymer of the tellurium family, fabricate films for ...

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  4. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. INSTRUMENTATION (ADVANCED INSTRUMENTATION FOR STANDARDIZED EMP TESTING)

    SBC: ENSCO Inc            Topic: N/A

    A GREAT DEAL OF EFFORT HAS BEEN SPENT IN RECENT YEARS TO DEVELOP STANDARDIZED METHODOLOGIES FOR ACCEPTING AND VERIFYING EMP HARDENED MILITARY FACILITIES. THE FIRST OF THESE STANDARDIZATION EFFORTS TO BE PUT INTO EFFECT APPLIES TO FIXED SITE, CRITICAL, TIME URGENT C4I FACILITIES. THE REQUIREMENTS EXISTS FOR AN ADVANCED INSTRUMENTATION APPROACH THAT CAN OVERCOME THE DIFFICULT ACQUISITION ENVIRONMENT ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
  6. NUCLEAR WEAPONS EFFECTS SIMULATION (INDUCTIVE COUPLER DEVELOPMENT FOR DIRECT DRIVE SIMULATION)

    SBC: ENSCO Inc            Topic: N/A

    ONE COMMON NUCLEAR WEAPONS EFFECTS CIMULATION TECHNIQUE SIMULATES THE EMP RESPONSE OF LONG CABLES USING DIRECT CURRENT INJECTION. DIRECT CURRENT INJECTION TYPICALLY INVOLVES THE CONNECTION OF HIGH VOLTAGE PULSE SOURCES TO THE CABLES THAT ARE ATTACHED TO A MILITARY SYSTEM. A RECENTLY DEVELOPED MILITARY STANDARD SPECIFIES THAT DIRECT CURRENT INJECTION TESTING WILL BE USED IN CONJUNCTION WITH SEVERAL ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
  7. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. FIBER OPTIC MEASUREMENT SYSTEMS FOR MOLDABLE EXPLOSIVES CURE MONITORING AND CHARGE CHARACTERIZATION

    SBC: GEO-CENTERS, INC.            Topic: N/A

    20 TON SPHERICAL EXPLOSIVE CHARGES MADE FROM MOLDABLE EXPLOSIVES HAVE BECOME INCREAINGLY IMPORTANT TO DNA'S ABOVEGROUND TEST PROGRAMS. THESE CHARGES PROVIDE LONGER DURATION FREE FIELD PRESSURE SIGNALS THAN CAN BE PRODUCED IN THE UNDERGROUND TEST ENVIRONMENT. THE SAFETY OF MANUFACTURING THESE 20 TON SPHERICAL CHARGES COULD BE GREATLY ENHANCED THROUGH THE DEVELOPMENT OF FIBER OPTIC BASED INSTRUMENTA ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government