You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A BRIGHT SOURCE OF MULTIPLY-CHARGED HEAVY IONS

    SBC: Fm Technologies Inc            Topic: N/A

    THIS RESEARCH AIMS TO DEVELOP AN IMPROVED SOURCE OF MULTIPLY-CHARGED IONS FOR HEAVY-ION INERTIAL FUSION AND OTHER APPLICATIONS THAT REQUIRE VERY HIGH BRIGHTNESS. A CONVENTIONAL GAS-DISCHARGE SOURCE IS PLANNED THAT DEPENDS ON THE COMBINATION OF TWO ADDITIONAL NOVEL FEATURES. FIRST, THE INITIAL DENSE HOT PLASMA GAS GENERATED FROM A HIGH PRESSURE MICROCAPILLARY DISCHARGE IS FURTHER HEATED BY A LASER ...

    SBIR Phase I 1992 Department of Energy
  2. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. 8a: Comprehensive Enzyme Stabilization for Cell-Free Bioproduction

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: 08a

    Bioproduction is typically reliant on host-organisms to express the enzymes needed for a synthetic pathway, which suffers from drawbacks like wasted metabolic resources, feedstock toxicity, and purification. Cell-free bioproduction is the logical alternative, but one major drawback is stability of the enzymes in the absence of a cell. For cell-free bioproduction to be feasible, enzymes will need t ...

    SBIR Phase I 2019 Department of Energy
  5. A Cost-Effective High-Configurable Iris Diaphragm Beam Halo Detector

    SBC: EUCLID TECHLABS, LLC            Topic: 09b

    Over the past few years several beam halo detection techniques have been invented to minimize the beam interception rate and accuracy of measurements. However, instrumentation for these measurements are complex systems and are not modular. The systems tend to be specialized for a single facility, or even a single part of a beamline. Also, these systems can hardly be reused or moved to another loca ...

    SBIR Phase I 2019 Department of Energy
  6. Advanced Manufacturing of Low-Cost Building Integrated Organic Photovoltaic Modules

    SBC: Nanoflex Power Corporation            Topic: 16a

    Commercial buildings consume 40% of total U.S. energy demand. Studies have shown that successfully integrating solar modules into building façades can substantially reduce the net building energy load depending on location, orientation, and time of year. Our Company brings with it 20+ years of critical intellectual property development on thin film organic solar cells, and we have subcontracted w ...

    SBIR Phase I 2019 Department of Energy
  7. Advanced Materials for CSP Molten Salt Storage

    SBC: POWDERMET INC            Topic: 12f

    Concentrating Solar Power utilizes molten salt thermal storage to enable 24 hour energy production and shift power production to times of less sunlight.Current molten salts operate using nitrate salts operating at 565°C.To improve performance, efficiency, and cost effectiveness switching to mixed chloride salts operating from 350-800°C is required. Increasing salt operating temperatures can redu ...

    SBIR Phase I 2019 Department of Energy
  8. Advanced Power Conversion Systems featuring SiC MOSFETs with In-Situ Restoration Capabilities

    SBC: GENESIC SEMICONDUCTOR INC.            Topic: 06b

    Power electronics for Grid-tied Battery Energy Storage Systems (BESS) featuring: (a) newly developed monolithically integrated High Voltage SiC MOSFET- Schottky Diodes; (b) Intelligent Gate Drivers that provide in-situ monitoring and restoration capabilities; and (c) novel three level Neutral point clamping topology are proposed. An isolated topology such as dual active bridge followed by an activ ...

    SBIR Phase I 2019 Department of Energy
  9. 23a: Functionally-Graded Cu-W Interlayers for Enhanced Divertor/Heatsink Bonding

    SBC: Faraday Technology, Inc.            Topic: 23a

    At present, an international consortium is engaged in a project that involves construction of an historical large-scale, energy-positive fusion reactor. Among the numerous components undergoing development and refinement are the divertor modules situated at the bottom of the vacuum vessel, which extract heat and ash produced by the fusion reaction, minimize plasma contamination, and protect the su ...

    SBIR Phase I 2019 Department of Energy
  10. A Fuzzy Expert Systems-Based Standard Generalized Markup Language Interface for Access and Collaborative Authoring of Multi-Domain Technical Documents on a Wide Area Network

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
US Flag An Official Website of the United States Government