You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. A NOVEL APPROACH FOR ENHANCING IN-SITU BIOREMEDIATION OF TRICHLOROETHYLENE

    SBC: Geo-microbial Technologies, In            Topic: N/A

    TRICHLOROETHYLENE (TCE) IS A WIDESPREAD POLLUTANT AND IS REPORTED TO BE THE MOST FREQUENTLY ENCOUNTERED CONTAMINANT AT HAZARDOUS WASTE SITES. ALL PREVIOUS ATTEMPTS AT IN SITU BIOREMEDIATION HAVE USED A PROCESS WHERE METHANTROPHIC BACTERIA WERE STIMULATED BY THE SUBSURFACE DELIVERY OF AIR AND METHANE RESULTING IN A "FORTUITOUS" COMETABOLISM OF TCE. THIS PROCESS AT ONE TIME APPEARED PROMISING FOR TH ...

    SBIR Phase I 1992 Environmental Protection Agency
  3. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. AQUEOUS BASED SULFUR FREE PULPING

    SBC: GUILD ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Environmental Protection Agency
  5. BUBBLELESS OXYGEN DISSOLUTION FOR REDUCING VOC EMISSIONS FROM WASTEWATER TREATMENT PLANTS

    SBC: Membran Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  6. DIRECT SULFUR RECOVERY

    SBC: Sorbent Technologies Corp            Topic: N/A

    N/A

    SBIR Phase I 1992 Environmental Protection Agency
  7. Disposable Micromachined Flow Immunoassay for Field Detection of Contaminants

    SBC: American Research Corporation of Virginia            Topic: N/A

    The use of enzyme-linked immunosorbent assay (ELISA) to detect contaminants such as solvents, fuels, and pesticides in soil and water samples is now well established. Although ELISA and related methods can facilitate analysis of samples, several washing and separation steps are involved that require 30 to 120 minutes per sample to reach equilibrium. Recently, near infrared fluorescence immunoassa ...

    SBIR Phase I 1997 Environmental Protection Agency
  8. ELECTROPLATING FROM ADDITIVE-FREE ELECTROLYTES

    SBC: Faraday Technology, Inc.            Topic: N/A

    Faraday Technology, Inc. proposes to develop an electroplating process fromadditive-free bath for the printed wiring board (PWB) industry and metal platingindustry. Current state-of-the-art metal plating relies on baths containingproprietary additive. These additives were developed empirically and consist ofbrighteners, levelers, and surfactants. These additives affect the platingprocess to yie ...

    SBIR Phase I 1995 Environmental Protection Agency
  9. EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS

    SBC: John Wreathall & Company            Topic: N/A

    THIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. FOURIER TRANSFORM SPECTROMETER FOR CONTINUOUS FLUE GAS MONITORING

    SBC: Remote Spectral Capture, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
US Flag An Official Website of the United States Government