You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Abductive Power System Control and Diagnostics
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
A Combined Micro-Mechanics, Fracture Mechanics, And Statistical Approach For Life Prediction Of Ceramic Matrix And Metal Matrix Composites
SBC: Tao Of Systems Integration Inc Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/ATII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
Acoustic and Dynamic Fatique Analysis and Design of Aeropropulsion Structures
SBC: WRIGHT MATERIALS RESEARCH CO. Topic: N/AFatigue problem has been an important issue in aeropropulsion system composite structures due to acoustic pressure, vibration and hostile environments. Various forms of damage caused by fatigue loadings can degrade the structural properties. This Phase I research proposes a combined BEM/FEM approach (using 2-D and 3-D elasticity theory) for dynamic analyses of aeropropulsion system structures. The ...
SBIR Phase I 1994 National Aeronautics and Space Administration -
Active Control/Alleviation Of Trailing (Streamwise) Vortices
SBC: High Technology Corporation Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration -
Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission
SBC: CENTER FOR REMOTE SENSING, INC. Topic: N/AWe propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...
SBIR Phase I 1994 National Aeronautics and Space Administration -
Active Suppression of Resonance Interactions between Shear-Layers and Cavities
SBC: High Technology Corporation Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
ADAPTIVE RAY TRACING OF TIME-DEPENDENT FLOWS ON MASSIVELY PARALLEL COMPUTERS
SBC: VIGYAN INC Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
A DISTRIBUTED INFORMATION SYSTEM ARCHITECTURE FOR PLANNING AND SCHEDULEING TOOLS
SBC: VIGYAN INC Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
Advanced Flight Control Diagnostics And Reconfiguration
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1995 National Aeronautics and Space Administration