You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. Development of a Differential Interferometric Technique for Measuring Magnetic Field Profiles in a Plasma Radiation Source

    SBC: HY-Tech Research Corp.            Topic: N/A

    The current distribution in plasma radiation sources is both a yardstick for measuring the coupling efficiency of the generator, and a means of studying the implosion dynamics of the load. Since the current distribution cannot be directly measured, it must be deduced from the magnetic field profile. Magnetic field distributions, based on the Faraday rotation of polarized laser light, are typical ...

    SBIR Phase I 1995 Department of DefenseDefense Threat Reduction Agency
  4. DEVELOPMENT OF UNIFORM GAS DISCHARGE PLASMA SOURCES FOR PLASMA OPENING SWITCH APPLICATIONS

    SBC: HY-Tech Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
  5. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  6. EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS

    SBC: John Wreathall & Company            Topic: N/A

    THIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. Grid System Matrix for EMP Transient Protection

    SBC: APPLIED CONCEPT RESEARCH, INC.            Topic: N/A

    NEMP (Nuclear Electro-Magnetic Pulse), lightning strikes, high powered EMI (Electro-Magnetic Induction), or ESD (Electro-Static Discharge) can impress high transient voltages on wires connecting to electronic modules. These transients are potentially destructive to aircraft electronic components and can result in system failures. To eliminate or substantially reduce the effects of transients on ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  8. INSTRUMENTATION (ADVANCED INSTRUMENTATION FOR STANDARDIZED EMP TESTING)

    SBC: ENSCO Inc            Topic: N/A

    A GREAT DEAL OF EFFORT HAS BEEN SPENT IN RECENT YEARS TO DEVELOP STANDARDIZED METHODOLOGIES FOR ACCEPTING AND VERIFYING EMP HARDENED MILITARY FACILITIES. THE FIRST OF THESE STANDARDIZATION EFFORTS TO BE PUT INTO EFFECT APPLIES TO FIXED SITE, CRITICAL, TIME URGENT C4I FACILITIES. THE REQUIREMENTS EXISTS FOR AN ADVANCED INSTRUMENTATION APPROACH THAT CAN OVERCOME THE DIFFICULT ACQUISITION ENVIRONMENT ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
  9. LONGWAVE ELECTROMAGNETIC SENSOR FOR COUNTERPROLIFERATION ACTIVITIES

    SBC: Pacific-sierra Research Corp.            Topic: N/A

    We propose to design a compact, multiple purpose electromagnetic sensor for monitoring the extremely low frequency (ELF), very low frequency (VLF), and low frequency (LF) spectrum. Our goal is to design a modular, low cost sensor capable of being configured for multiple applications and capable of being employed in remote, unattended sensor networks. We describe three applications or scenarios t ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  10. NUCLEAR WEAPONS EFFECTS SIMULATION (INDUCTIVE COUPLER DEVELOPMENT FOR DIRECT DRIVE SIMULATION)

    SBC: ENSCO Inc            Topic: N/A

    ONE COMMON NUCLEAR WEAPONS EFFECTS CIMULATION TECHNIQUE SIMULATES THE EMP RESPONSE OF LONG CABLES USING DIRECT CURRENT INJECTION. DIRECT CURRENT INJECTION TYPICALLY INVOLVES THE CONNECTION OF HIGH VOLTAGE PULSE SOURCES TO THE CABLES THAT ARE ATTACHED TO A MILITARY SYSTEM. A RECENTLY DEVELOPED MILITARY STANDARD SPECIFIES THAT DIRECT CURRENT INJECTION TESTING WILL BE USED IN CONJUNCTION WITH SEVERAL ...

    SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government