You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  2. A Combined Micro-Mechanics, Fracture Mechanics, And Statistical Approach For Life Prediction Of Ceramic Matrix And Metal Matrix Composites

    SBC: Tao Of Systems Integration Inc            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  3. A COMPACT SOLID-STATE RANGE SENSOR WITH MILLIMETER DEPTH RESOLUTION

    SBC: CLARK-MXR, INC.            Topic: N/A

    THE GOAL OF THIS PROGRAM IS TO DEMONSTRATE A HIGH-RESOLUTIONACTIVE RANGING SYSTEM USING LOW-TEMPERATURE-GROWN (LTG) GAAS PHOTOCONDUCTORS AS DEPTH SENSORS. THESE NEWLY-DEVELOPED SOLID-STATE DEVICES ARE CHARACTERIZED BY AN EXCEPTIONALLY BROAD FREQUENCY RESPONSE (UP TO 375 GHZ @ -3 DB) AND A VERY HIGH SENSITIVITY (70% QUANTUM EFFICIENCY). TO REDUCE THE NOISE BACKGROUND THEY CAN BE GATED ON A PICOSECO ...

    SBIR Phase I 1992 National Aeronautics and Space Administration
  4. Active Control/Alleviation Of Trailing (Streamwise) Vortices

    SBC: High Technology Corporation            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  5. Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    We propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  6. Active Suppression of Resonance Interactions between Shear-Layers and Cavities

    SBC: High Technology Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  7. Adaptive Control Of Air Turbo Ramjet

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  8. ADAPTIVE RAY TRACING OF TIME-DEPENDENT FLOWS ON MASSIVELY PARALLEL COMPUTERS

    SBC: VIGYAN INC            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  9. A DISTRIBUTED INFORMATION SYSTEM ARCHITECTURE FOR PLANNING AND SCHEDULEING TOOLS

    SBC: VIGYAN INC            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  10. Advanced Flight Control Diagnostics And Reconfiguration

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government