You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  2. Adaptive Wavelet Data Compression

    SBC: Fastman, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  3. Advanced Thermoelectric Cooling Materials Through Anisotropic Modifications

    SBC: Marlow Industries, Inc.            Topic: N/A

    Todays thermoelectric cooling materials exhibit a peak performance, termed ZT, of about 1.0. Recent development in the theory of quantum-well superlattices suggest that ZTs of up to 9 are possible. Work is ongoing to synthesize superlattices using techniques such as molecular beam epitaxy, sputtering and chemical vapor deposition but to date high quality thermoelectric superlattices have not bee ...

    SBIR Phase I 1995 Department of DefenseArmy
  4. A Generalized Event Representation Modeling and Analysis Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: N/A

    This SBIR Phase I project will create an event representation framework and generate a catalogue of reasoning mechanisms for transforming domain specific events into a convenient representational framework. The choice of the representation scheme used to model a domain for analysis by the neural network of fuzzy logic system can make an enormous difference in the ease and efficiency of the proble ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. A Method and Automated Support Tool for Model Correlation

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: N/A

    Enterprises today rely heavily upon a wide variety of modeling methods and modeling technologies for the development of requirements for complex, software intensive systems. In general, however, (i) the different modeling methods provide very different perspectives on system information, (ii) models created with these methods are expressed in very different modeling languages, and (iii) models ar ...

    SBIR Phase I 1996 Department of DefenseArmy
  6. An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle

    SBC: NEW GENERATION MOTORS CORP.            Topic: N/A

    Military scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...

    SBIR Phase I 1997 Department of DefenseArmy
  7. ANALYSIS AND EVALUATION OF ADVANCED DIRECTION FINDING (DF) APPROACHES

    SBC: INFORMATION SYSTEMS LABORATORIES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  8. A New Advanced System for Gas Turbine Combustors

    SBC: Energy Innovations, Inc.            Topic: N/A

    Cooling of the liner wall in gas turbine combustors has become increasingly difficult and problematic as engine pressure ratios are constantly increased. Existing cooling techniques have limitations in perfomance. At Energy Innovations, Inc., we have developed a new technology that has potential to effectively and efficiently solve the cooling problem for gas turbine combustors. One significant ...

    SBIR Phase I 1997 Department of DefenseArmy
  9. A Novel, Inexpensive approach to Inertial Guidance for Gun Launched Projectiles

    SBC: S. Adelman Associates            Topic: N/A

    The notion of using an inexpensive inertial augmentation system for a tube launched ordnance, either with or without a terminal homing sensor, has existed for some time now. The main drawback has been the high cost associated with reliable inertial components and the hardening problem with gyroscopes or other rate sensing elements. Some of the solutions that have been proposed to date attempt to ...

    SBIR Phase I 1995 Department of DefenseArmy
  10. A Novel Non-Lethal Effects Device

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
US Flag An Official Website of the United States Government