You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  2. ADAPTIVE RESOURCE ALLOCATION FOR ADVACED ELINT\ESM SYSTEMS

    SBC: Greenbriar Systems Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseArmy
  3. An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle

    SBC: NEW GENERATION MOTORS CORP.            Topic: N/A

    Military scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...

    SBIR Phase I 1997 Department of DefenseArmy
  4. ANALYSIS AND EVALUATION OF ADVANCED DIRECTION FINDING (DF) APPROACHES

    SBC: INFORMATION SYSTEMS LABORATORIES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  5. A Novel, Inexpensive approach to Inertial Guidance for Gun Launched Projectiles

    SBC: S. Adelman Associates            Topic: N/A

    The notion of using an inexpensive inertial augmentation system for a tube launched ordnance, either with or without a terminal homing sensor, has existed for some time now. The main drawback has been the high cost associated with reliable inertial components and the hardening problem with gyroscopes or other rate sensing elements. Some of the solutions that have been proposed to date attempt to ...

    SBIR Phase I 1995 Department of DefenseArmy
  6. A Novel Non-Lethal Effects Device

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  7. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. Applications of Radar Imaging to High Altitude Measurements

    SBC: METRATEK, INC.            Topic: N/A

    The program objective is to adapt radar imaging technology to meet test center measurement requirements at high altitudes and long ranges where current optics and radars are lacking. METRATEK is in a unique position to accomplish this effort because we have a proven reputation for establishing the state of the art in advanced radar imagine technology and we have already developed and proven the t ...

    SBIR Phase I 1995 Department of DefenseArmy
  9. Appurtance Attachments for Composite Systems

    SBC: Witten Company, Inc.            Topic: N/A

    This exploratory development program is a study of existing means of attaching hardware to composite materials in general. Special attention for mounting racks, brackets, modular armor and other types of equipment and hardware on combat and tactical vehicle will be provided. These vehicles use all types and shapes of composite structure including: solid laminates, thin wall composites, pultrusion, ...

    SBIR Phase I 1994 Department of DefenseArmy
  10. A RSTA Algorithmic Framework with Uncertainty Management

    SBC: Cyber Solutions, Inc.            Topic: N/A

    One of the most challenging information management problems related to the Reconnaissance, Surveillance and Target Acquisition (RSTA) missions is the real-time spatio-temporal fusion of target-specific cues from a netwotk of multiple sensor platforms. A robust algorithmic framework is necessary to involve the multiple agents together and achieve the optimal trade-off between low false alarm rate ...

    SBIR Phase I 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government