You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Automatic Feature Combined Track-Detect-Localize Technique
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AA progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...
SBIR Phase I 1997 Department of DefenseNavy -
Simulation Based Concurrent Planning And Development System
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of DefenseNavy -
Acoustic Pressure Gradient Imager For Divers
SBC: EMPIRICAL TECHNOLOGIES CORPORATION Topic: N/AThe contractor has patented technology for a unique process that directly converts a two-dimensional acoustic disturbance, such as a wave front, into an intensity-mapped visible image in real-time without electronic circuitry; that is, it is a direct pressure gradient imager. The imager relies on the piezo-dichroic properties of a continuous layer of a dichroic material thin film that serves as bo ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
Antenna for GPS CCM Improvement (SPC Proposal 5179)
SBC: System Planning Corp. Topic: N/AAntijam protection for GPS receivers can be provided in a cost-effective way by restricting the antenna reception to the upper hemisphere only, thereby eliminating the majority of intentional and unintentional jamming sources in either a war- fighting context or terrorist attack scenario. Competing schemes using null- steering antennas or receiver/processor improvements are not cost effective and ...
SBIR Phase I 1995 Department of DefenseNavy -
Submarine Combat System C4I and IM and M Technology
SBC: DARLINGTON, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseNavy -
Image Data Mapping, Compression, Archive and Display Software
SBC: System Quality Consultants, Topic: N/AA new emphasis in naval oceanography requires the use of a graphical user interface based software tool which seamlessly integrates the multifaceted functionality required to process, archive, interactively explore, visualize, and analyze remotely sensed oceanographic data. This proposed research effort will build on a working prototype that is currently in use at the Naval Research Laboratory's ...
SBIR Phase I 1995 Department of DefenseNavy -
Measuring the Effect of Drawdown on Personnel Retention
SBC: Sag Corp Topic: N/ASAG corporation proposes an econometric model to measure the effect of drawdown programs on Navy personnel retention. The model builds on previous retention research and includes a combination of behavioral and non-behavioral techniques to improve Navy's ability to accurately project future retention decisions. Innovative econometric techniques are employed to control for the effect of drawdown ...
SBIR Phase I 1995 Department of DefenseNavy -
Integrated Data/Model Comparison Tool
SBC: COMPUTATIONAL PHYSICS, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseNavy -
Simulation Based Design for Submarine C4I Applications
SBC: TRIDENT SYSTEMS LLC Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseNavy -
VOICE ASSISTED MISSION PLANNING VIA NATURAL LANGUAGE UNDERSTANDING ABDUCTIVE NETWORKS
SBC: ABTECH CORPORATION Topic: N/AAbTech will survey the hardware and software available to determine what capabilities should be included in a natural language understanding mission planning assistant. A language parsing and encoding system in ANN will be used to parse and encode ASCII outpuf resulting from a voice recognition system such as DragoDictate. The ASCII output from the voice recongnition system will go to the ANN la ...
SBIR Phase I 1995 Department of DefenseNavy