You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
BattleView: A Distributed System for Intelligent Integrated Hypermedia Presentation Services for the Digital Battlefield
SBC: DEUMBRA, INC. Topic: N/AA number of applications in other commercial as well as military sectors require that multiple distributed data sources be consulted when a specific need arises, and that the results of these consultations be presented to the user. Often, these results are complex and involve multiple documents. Presentation of such results involves automatically generating browsable documents so that the user c ...
SBIR Phase I 1996 Department of DefenseArmy -
SCALABLE MULTIMEDIA DATABASE INTEGRATION AND VISUALIZATION TECHNOLOGY
SBC: DEUMBRA, INC. Topic: N/AIn this proposal, we will develop a uniform framework, called a multimedia mediator, for integrating and querying multimedia data as well as heterogenous data located on a distributed network. The multimedia mediator will use distributed computing technology to scale up to real-world applications. We will develop graphical query languages and query engines whereby an end-user can query a system ...
SBIR Phase I 1996 Department of DefenseNavy -
Data Mining and Integration Technologies for Information Exploitation
SBC: DEUMBRA, INC. Topic: N/AWe shall deliver an information exploitation demonstration prototype simulatirsg actual rlata exploitation. Within this prototype we shall deliver five different types of capabilities. The first three capabilities are data mining tools. These tools shall demonstrate the capability of identifying electronic patterns or f ingerprints in data, relationships between data, and visualizations of such ...
SBIR Phase I 1997 Department of DefenseAir Force -
Data Mining Techniques for Plan Sentinel Development
SBC: DEUMBRA, INC. Topic: N/AWe propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...
SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency -
Miniature Elctrohydraulic Total Artificial Heart
SBC: ABIOMED, INC. Topic: N/AThe limited availability of donor hearts for people with end stage heart failure has driven the condevelopment of mechanical circulatory support systems (MCSSs). MCSSs can be broadly classified intocontinuous flow systems. Pulsatile systems drive blood indirectly through blood pumps, resulting inThis disadvantage of these systems, however, is their relatively large size. Continuous flow systemssim ...
SBIR Phase I 1995 Department of Health and Human Services -
Remote Suture Placement--Laparoscopic Abdominal Surgery
SBC: ABIOMED, INC. Topic: N/AMinimal access abdominal surgery through the laparoscope has generally replaced surgical procedureslaparotomy for several common procedures, including cholecystectomy and appendectomy. More complicatgastrointestinal operations are also being attempted laparoscopically. Many of these procedures aretechniques which are not yet standard laparoscopic techniques. A basic surgical technique necessarythe ...
SBIR Phase I 1995 Department of Health and Human Services -
Development of Calcification Resistant Valve Prosthesis
SBC: ABIOMED, INC. Topic: N/ACalcification of blood contacting surfaces has been the key impediment to the development of polymevalve prostheses and other polymeric implantables. The deposition of calcium plaques as hydroxyapatiand potentially leads to valve dysfunction. That calcification proceeds preferentially along surfacestress only exacerbates the problem. This work is based on the hypothesis that calcification along fa ...
SBIR Phase I 1995 Department of Health and Human Services -
Laparoscopic Enterocystoplasty with Laser Welding
SBC: ABIOMED, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of Health and Human Services -
Bearingless Disposable Centrifugal Blood Pump
SBC: ABIOMED, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of Health and Human Services -
CONTROL SYSTEM FOR ROTARY BIVENTRICULAR ASSIST IMPLANT
SBC: ABIOMED, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Health and Human Services