You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A2a--Adenosine Agonist for Cardiovascular Imaging

    SBC: Discovery Therapeutics, Inc.            Topic: N/A

    Adenosine produces coronary vasodilation through activation of A-2a adenosine receptors. However adalso acts at A1 adenosine receptors to slow atrioventricular conduction and when injected into man ican be blocked with A1 receptor antagonists. DTI has synthesized a number of adenosine analogs that2a subtype of adenosine receptor and have identified WRC-0470 as a potent selective short acting corou ...

    SBIR Phase I 1995 Department of Health and Human Services
  2. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  3. ABDUCTIVE/EXPERT SYSTEM CONTROLLER

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  4. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  5. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Education
  6. A BRIGHT SOURCE OF MULTIPLY-CHARGED HEAVY IONS

    SBC: Fm Technologies Inc            Topic: N/A

    THIS RESEARCH AIMS TO DEVELOP AN IMPROVED SOURCE OF MULTIPLY-CHARGED IONS FOR HEAVY-ION INERTIAL FUSION AND OTHER APPLICATIONS THAT REQUIRE VERY HIGH BRIGHTNESS. A CONVENTIONAL GAS-DISCHARGE SOURCE IS PLANNED THAT DEPENDS ON THE COMBINATION OF TWO ADDITIONAL NOVEL FEATURES. FIRST, THE INITIAL DENSE HOT PLASMA GAS GENERATED FROM A HIGH PRESSURE MICROCAPILLARY DISCHARGE IS FURTHER HEATED BY A LASER ...

    SBIR Phase I 1992 Department of Energy
  7. A BURIED ELECTRODE MACH ZEHNDER WAVEGUIDE INTENSITY MODULATOR WITH OPERATION SPEEDS IN EXCESS OF 100 GHZ

    SBC: Apa Optics, Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES AN APA OPTICS PROGRAM TO DEVELOP A HIGH SPEED (100GHZ) GAAS WAVEGUIDE BASED MACH ZEHNDER MODULATOR. OUR APPROACH CENTERS ON THE USE OF A BURIED ELECTRODE CONFIGURATION TO ACHIEVE VELOCITY MATCHING OF THE RF AND OPTICAL SIGNALS. THIS WE FEEL WILL RESULT IN A DEVICE WITH A BROADBAND RESPONSE FROM DC TO 100GHZ. WE WILL WORK IN CONJUNCTION WITH THE ULTRFAST SCIENCE LAB AT THE U ...

    SBIR Phase I 1992 Department of DefenseArmy
  8. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. Achieving Process Repeatability and Controllability in RTM for the Air Force

    SBC: Design Evaluation 4, Inc.            Topic: N/A

    After 20 years in the Resin Transfer Molding (RTM) industry and 5 years of subcontractor experience in Low Cost Composite Weapons (LCCW) with the McDonnell Douglas Missile Systems Company, we concur that process repeatability, process controllability and uneven wet-out are major process drawbacks to a system that reduces weight and cost by 30 percent compared to metals. We propose to eliminate the ...

    SBIR Phase I 1994 Department of DefenseAir Force
  10. A Combined Micro-Mechanics, Fracture Mechanics, And Statistical Approach For Life Prediction Of Ceramic Matrix And Metal Matrix Composites

    SBC: Tao Of Systems Integration Inc            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government