You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. ABDUCTIVE NETWORKS FOR COMPLEX AERONAUTICAL SYSTEMS DEVELOPMENT

    SBC: ABTECH CORPORATION            Topic: N/A

    INNOVATIVE ARTIFICIAL INTELLIGENCE TECHNIQUES HAVE THE POTENTIAL TO SOLVE MANY COMPLEX AIR FORCE PROBLEMS. ADVANCES IN COMPUTING SPEED AND EXISTING SOFTWARE TECHNOLOGY ALONE ARE UNLIKELY TO RESULT IN REAL-TIME AERONAUTICAL SYSTEMS CAPABLE OF MEETING THE COMPLEX REQUIREMENTS OF THE AIR FORCE MISSION. RATHER, AN ALTERNATIVE METHODOLOGY SUCH AS ABDUCTIVE TECHNOLOGY, A NEW TECHNOLOGY PRESENTED IN THIS ...

    SBIR Phase I 1990 Department of DefenseAir Force
  3. ABDUCTIVE NETWORKS FOR SPACE SURVEILLANCE AND CLASSIFICATION

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  4. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  5. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Education
  6. A BROADBAND HIGH-FREQUENCY ANTENNA STRUCTURE FOR THE TACAMO AIRFRAME WAS STUDIED.

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    A BROADBAND HIGH-FREQUENCY ANTENNA STRUCTURE FOR THE TACAMO AIRFRAME WAS STUDIED. THE STRUCTURES STUDIED WOULD NOT DEGRADE AERODYNAMIC PERFORMANCE AND WOULD ALLOW MULTIPLE TRANSMITTER OPERATION OVER THE FULL 2 TO 30 MHZ BAND. EVALUATION FACTORS WERE EFFICIENCY, BANDWIDTH, MINIMUM LOSSES, LOW RESISTANCE, AND MINIMUM CHANGES TO THE AIRCRAFT. INCLUDED IN THE STUDY WERE LONG WIRE, EMBEDDED, DIEELECTRI ...

    SBIR Phase I 1985 Department of DefenseNavy
  7. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  8. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. A CENTRAL ELEMENT IN MILITARY EXPERT-SYSTEM (ES) APPLICATION IS THE DYNAMIC HANDLING AND ADAPTIVE CONTROL OF EVIDENCE AND UNCERTAINTY.

    SBC: Northern Virginia Research Ins            Topic: N/A

    A CENTRAL ELEMENT IN MILITARY EXPERT-SYSTEM (ES) APPLICATION IS THE DYNAMIC HANDLING AND ADAPTIVE CONTROL OF EVIDENCE AND UNCERTAINTY. THERE ARE CURRENTLY FIVE DISTINCT APPROACHES TO THE PROBLEM OF EVIDENTIAL REASONING (ER). THESE ARE THE BAYESIAN, NEYMAN-PEARSON, DEMPSTER-SHAFTER, KYBURG, AND POSSIBILITY/FUZZY APPROACHES. IN ADDITION TO THE ER TASK OF REVISING DEGREES OF BELIEF OR SUPPORT, WE MUS ...

    SBIR Phase I 1985 Department of DefenseArmy
  10. A COMPUTER-AIDED SPEECH FLUENCY ESTABLISHMENT TRAINER

    SBC: The Annandale Fluency Clinic            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Health and Human Services
US Flag An Official Website of the United States Government