You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
FIBER OPTIC LONG COUNTER
SBC: FIBERTEK, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
HIGH-POWER TRANSVERSE-MODULATION MICROWAVE GENERATOR WITH AXIAL-FIELD CONFINEMENT
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
INLET-PRECHARGED LIMESTONE EMISSION CONTROL (LEC) PROJECT
SBC: ETHERWARE, LLC Topic: N/AMANY UTILITY AND INDUSTRY COAL-FIRED BOILERS HAVE ELECTROSTATIC PRECIPITATORS (ESPS) ALONE, WHICH ARE NOT CAPABLE OF REMOVING SO2. MANY OLDER ESPS WILL REQUIRE UPGRADING IN THE 1990S TO MEET MORE STRINGENT PARTICULATE STANDARDS. ETS, INC. HAS TESTED ITS PATENTED LIMESTONE EMISSION CONTROL (LEC) SYSTEM, DEMONSTRATING GREATER THAN 90% SO2 REMOVAL CAPABILITY. LECS CAN BE PLACED DOWNSTREAM OF ESPS. IT ...
SBIR Phase I 1990 Department of Energy -
REDUCING UTILITY DEMAND LEVELS BY AUTOMATIC DEMAND PEAK SHAVING WITH USER STANDBY GENERATORS.
SBC: Hallmark Energy Economics Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEPRESSED COLLECTORS FOR MEGAWATT GYROTRONS
SBC: PHYRE TECHNOLOGIES, INC. Topic: N/AA PROGRAM IS PROPOSED TO SHOW THE FEASIBILITY OF DEPRESSED COLLECTORS FOR VERY HIGH AVERAGE POWER (APPROX. 1MW) GYROTRON OSCILLATORS FOR FUSION APPLICATIONS. INITIAL CALCULATIONS INDICATE THAT COLLECTION EFFICIENCIES EXCEEDING 75% CAN BE REALIZED. USE OF SUCH A COLECTOR ON A GYROTRON WITH A BASE EFFICIENCY OF 30% WOULD INCREASE THE EFFICIENCY TO OVER 60%. SUCH A DRAMATIC INCREASE IN EFFICIENCY WOU ...
SBIR Phase I 1990 Department of Energy -
Development of an RF Tagging Method for Use in Monitoring International Nonproliferation Treaty Compliance
SBC: Randtec, Inc. Topic: N/A41267 November 21, 1996 RANDTEC, Inc. The Department of Energy is committed-to supporting the nuclear non-proliferation community in its efforts to develop effective means for treaty verification of nuclear material stockpiles. Tag and seal systems have an important role as part of the overall verification process. Specifically, radio frequency (RF) tags ...
SBIR Phase I 1996 Department of Energy -
Pulsed Induction Joining of Sapphire to Metal for Gyrotron Windows
SBC: Fm Technologies Inc Topic: N/A41291 November 19, 1996 FM Technologies, Inc. The window is currently the single most serious mode of failure of high power gyrotrons, a device for heating magnetic fusion plasmas. This project will develop a new technique for joining ceramic materials, used for these windows, to the metals that hold the windows in place. A pulsed induction coil system w ...
SBIR Phase I 1996 Department of Energy -
Bending System for Recirculating Accelerators with Space-Charged Dominated Beams
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
Oxidation Induction Time Technology for Electric Cable Condition Monitoring and Life-Assessment
SBC: Pacific-sierra Research Corp. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy